My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROYAL OAKS
>
0
>
3500 - Local Oversight Program
>
PR0545667
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 4:46:38 PM
Creation date
5/12/2020 4:13:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545667
PE
3528
FACILITY_ID
FA0003947
FACILITY_NAME
COS ROYAL OAKS STORM PUMP
STREET_NUMBER
0
STREET_NAME
ROYAL OAKS
STREET_TYPE
DR
City
STOCKTON
Zip
95209
APN
07228027
CURRENT_STATUS
02
SITE_LOCATION
ROYAL OAKS DR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> material to be sampled unless otherwise specified by the lead regulatory agency. The <br /> samples will be composited by the state certified laboratory personnel prior to testing. <br /> 12.0 GROUNDWATER SAMPLING PROTOCOL <br /> Prior to arriving at the sampling site, all sampling equipment will be washed with nonphosphate <br /> detergent (Alconox or equivalent), and rinsed twice with tap water, once with acetone, and once <br /> with deionized water. this procedure will be carried out on-site before sampling of other <br /> monitoring wells, if more than one well is to be sampled with the sample sampling device. <br /> Immediately prior to sampling, the depth to water (DTW) in the well will be recorded: The <br /> thickness of product on top of the groundwater, if present, will be measured using an interface <br /> probe. The procedure for monitoring is presented in Section 9.0 (Groundwater Monitoring <br /> Protocol). <br /> If free product is detected, analysis of groundwater at the interface for dissolved product will not be <br /> conducted. A product sample will be collected for source identification. If all free product cannot <br /> be removed, an interval specific sampling device may be utilized to collect a sample from below the <br /> zone of free product. Before collecting groundwater samples from each well, the well will be <br /> purged until indicator parameters (temperature, conductivity, and pH) stabilize. This will entail the <br /> removal of at least four well casing volumes by bailing or pumping. The criteria for determining <br /> well casing volumes and temporary storage of purged water is outlined in Section 10.0 (Well <br /> Development Protocol). The indicator parameter measurements will be taken both before and after <br /> purging of each well casing volumes. Once the well is purged and indicator parameters have <br /> stabilized, a sample will be collected after the water level approaches 80 percent of its initial <br /> W:\Admin\SheHs\QAQC-98.DoC <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.