Laserfiche WebLink
Spill Bucket Testing Report <br /> 1 . FACILITY INFORMATION <br /> Facility Name: Yosemite Avenue ARCO Am Pm Date of Testing: 6/14/2019 <br /> Facility Address: 1711 E. Yosemite Ave. Manteca, CA 95336 <br /> Facility Contact: Jesse Phone: (209) 825-6784 <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: Diamond Petroleum Services, Inc. <br /> Technician Conducting Test: Guadalupe Sanchez <br /> Contractor License # 1005444 ICC Certification # 5250451 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: Hydrostatic <br /> Test Equipment Used: Standard Tape Measure Equipment Resolution: 1/ 16" <br /> Identify Spill Bucket (By Tank T1 : 87 Master Fill T2 : 87 Slave Fill T3: 91 Fill <br /> Number, Stored Product, etc. <br /> Bucket Installation Type : Direct Bury Direct Bury Direct Bury Direct Bury <br /> x Contained in Sump x Contained in Sump x Contained in Sump Contained in Sum <br /> Bucket Inside Diameter: <br /> Bucket Depth: 13 1 /8" 12 '/z" 13 '/4" <br /> Wait time between •applying 5 minutes 5 minutes 5 minutes <br /> vacuunVwater and start of test: <br /> Test Start Time (TI): 12 :29 p.m. 12 :29 p.m. 12:29 p.m. <br /> Initial Reading (R►): 12 % 11 %" 121 /8 <br /> Test End Time (TF): 1 :29 P.M. 1 :29 P .M. 1 :29 p.m. <br /> Final Reading (RF): 12 % 11 ''/2" 121 /8 <br /> Test Duration (TF — Ti): 1 hr 1 hr 1 his <br /> Change in Reading (Rpm RI) : 0 0 0 <br /> Pass/Fail Threshold or 1/8" 1 /8" 1 /8" <br /> Criteria: <br /> Test Result: x Pass 0 Fail x Pass 0 Fail x Pass 0 Fail Pass Fail <br /> Comments: <br /> Technician's Signa Date:• 6/14/2019 <br />