My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1711
>
2300 - Underground Storage Tank Program
>
PR0231455
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2020 12:26:00 PM
Creation date
5/13/2020 11:38:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231455
PE
2361
FACILITY_ID
FA0003612
FACILITY_NAME
Yosemite Avenue Arco AmPm
STREET_NUMBER
1711
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
1711 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recgmmended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Faciliti <br /> ... • <br /> NQTE : If the fill cais not included <br /> luded in the <br /> u d the spill bucket. The vacuum level is monitored f <br /> � p. <br /> spill bucket test and/or the cap is not tight, it a 1 -minute period , <br /> could be the source of potential fuel contarni- 6 ,3 ,3 Test Equipment , Test equipment sht <br /> nation from water intrusion. Y include: <br /> NOTEo Before permanently plugging, ensure vacuum test apparatus (The test apparatus m• <br /> that local regulations allow the drain valve to be available from the spill bucket manufactu>y <br /> be permanently plugged. It includes an air pressure regulator, a vacuu <br /> _ , . . . . _ . ., . . . . source, a vacuum gauge with a minimum 0-: <br /> inch water column range and a control vale <br /> 6 .2 . 5 ' Test Procedure , The control valve is used, to adjust the vacuu <br /> L Add water to the spill bucket to a level within level:) ; <br /> 1 . 5 inches of the top of the spill bucket. Allow ° test cover (The cover is equipped with a test f <br /> the water to settle for 5 minutes before the initial ting. ) ; <br /> water level measurement is taken. <br /> o plumber 's plug (appropriate 'size, if used) ; <br /> 2 . Place the measuring stick vertically at the lowest <br /> point in the spilt bucket and extending above the ° stopwatch or other time-measurement devi <br /> water level to allow for an accurate measure- capable of measuring a 1 -second increment; <br /> ment to be taken. The location of the measuring ° Basketing material (The purpose of the gt <br /> stick must remain the same for each water level keting material is to provide an air-tight se <br /> measurement. Document the initial water level between the test cover and the spill bucket. ) . <br /> measurement as measured from the bottom of <br /> the spill bucket. Alternative measurement meth- o • 500 water column <br /> ods may be used provided that measurement to Vacuum Vacuum Gauge <br /> 1 /16 (0.06:3) inch can be made. source <br /> 3 . Take all precautions to prevent the water level <br /> from being disturbed during the duration of the control <br /> test. Valve <br /> 4. After 1 hour, document the ending water level <br /> measurement. <br /> 5. Upon completion of the test, remove and dis- <br /> pose of the water according to Section 6.7 , and <br /> dry the inside of the spill bucket before returning Plumber's Plug <br /> it to service. Tank Riser Pips <br /> 6 ,2. 6 PasVFall Criterla , If the water level has <br /> dropped less than 1/8 (0 . 125) inch, the spill bucket <br /> passes the integrity test, <br /> If the water level has dropped 1/8 (0. 125) inch or <br /> greater, the spill bucket fails the integrity test. <br /> 64 Spill Sucket Integrity Testing a— Vacuum Test ;FICUFIE 6.2. The cover must make a tight seal with th <br /> M <br /> ;t spill spill bucket to prevent leakage when the vacuum is <br /> 6 ,3 , Purposov This method is used to test the pulled during the test. <br /> x. <br /> integrity of single-walled spill buckets or the pri- _ _ kw" .�. ._ . . � .. . . <br /> maty containment of secondarily contained spill <br /> buckets. 13,/u;Zy4ill15Ca Use only an air-operated vac- <br /> uum source or a vacuum pump pow- <br /> i 6 . 3 ,2 Description of Test. Using a specially eyed by an explosion-proof motor, Vacuum <br /> i equipped test cover, a partial vacuum is applied to pumps with electric motors that are not <br /> pel , org Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.