Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM Wage 4 of 6 <br /> Vlll, MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed If a monitoring panel Is used to perfonn leak detection monitoring. Y I N INA <br /> Are the visual and audible alarms operational? ❑ ® ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, ® ❑ O <br /> functionally tested and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ® O ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected, functionally tested, and confirmed operational? ® O ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or Is electrically ® O O <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® LO <br /> ❑ <br /> Which sensors initiate positive shut down? (Check alf that apply.) ® Sump ® Under4spenser containment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? ❑ <br /> For any answer of "N" above describe in section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> UDC and STP sensors initiate positive shutdown <br /> The 91 annular sensor failed to activate an audible and visual alarm when tested . <br /> The 91 annular sensor needs to be replaced . <br /> X. IN TANK GAUGING TESTING <br /> ® Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment Is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if In-tank gauging Is used to Perfonn leak detection monitodn , <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ground ❑ ❑ ❑ <br /> faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, O ❑ ❑ <br /> and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ O <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled property? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? O ❑ ❑ <br /> For any answer of "N" above describe In section X1 how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> V Voa N a Nn NA a tint Anrhtahla <br />