Laserfiche WebLink
1 <br /> From$01ance to solutions <br /> PROJECT SITE: Alden Park 2010 Annual Monitoring and Sampling <br /> Well Number Well Diameter Well Depth Depth to <br /> (ft) Water ] Date Time <br /> ' MW-4 2" � r —IL <br /> �( �`� J to 41C? + <br /> MW-7 2" (01. 9-�!- T4 0 9,149 <br /> MW-8 2" f 'I'S • `Ag l I.4�L 1d.0S" <br /> MW-9 4" i c'! 3,5- 3 it, i O a o <br /> MW-11 4" -7—G, lx' 1�. 14 lc <br /> 1 MW-12 4" « .03 16`tE-2 <br /> MW-14 41- <br /> Depth <br /> "Depth to SPO/Groundwater Water Level <br /> Measurement Method: MeterlSerial#. WL01 <br /> SPO Extracted =SPO thickness X well casing gal/linear ft(2"=0.17, 3"=U8,4"=0.66, 6"= 1.5) <br /> Notes: <br /> ' Sampled By: � <br /> Form QC Checked By: <br /> Entered Into EIM By: <br /> EIM QC Checked By: <br /> 1 <br /> 1 <br />` Alden Park GWM data sheet.xls <br />