My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1265
>
2900 - Site Mitigation Program
>
PR0506292
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:01:08 PM
Creation date
5/13/2020 2:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506292
PE
2950
FACILITY_ID
FA0007328
FACILITY_NAME
EMPTY LOT
STREET_NUMBER
1265
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14327041
CURRENT_STATUS
02
SITE_LOCATION
1265 N SHAW RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File No. 20-3937-01 <br /> June 21, 1996 <br /> relative groundwater elevations with respect to mean sea level or a local benchmark <br /> by subtracting them from the surveyed casing elevations. <br /> The resulting groundwater elevations will be used to assess the direction of the <br /> groundwater gradient at the time of sampling. This information can then be used to <br /> assess which wells represent upgradient and which wells represent downgradient <br /> groundwater conditions. <br /> Approximately forty-eight (48) hours after the riew well is developed, three to five <br /> well volumes will be purged, and samples wi11 be collected from the wells, as <br /> described in Attachment A. The three monitoring well groundwater samples will be <br /> submitted to a State certified laboratory for the following analyses: <br /> • Total Petroleum Hydrocarbons Purgeable (Gasoline Range) by EPA Method <br /> 8015M/5030 [TPH-G] <br /> • Benzene, Toluene, Ethylbenzene, Xylenes by EPA Method 8020/5030 <br /> [BTEX] <br /> • Total Extractable Petroleum Hydrocarbons (Fuel Fingerprint) by EPA Method <br /> 8015M <br /> • Halogenated Volatile rganlcs by EPN Method 80.10[ <br /> • Dibromochloropropane (DBCP) by EPA Method,504 f. <br /> The samples will be submitted for analyses :on a normal laboratory schedule <br /> requiring approximately two weeks (10 working days) for completion unless the <br /> optional rush analytical turnaround is requested by the client at an additional charge. <br /> Task E04 -Soil Sampling for Asbestos <br /> Four soil samples would be obtained from just inside the property lira near the <br /> railroad tracks. All samples would be obtained from the surface soil. The four <br /> soil samples would be submitted for polarized light microscopy (PLM) analysis <br /> for asbestos. <br /> I_askE05__- Reporting <br /> Upon completion of the field activities and receipt of the analytical results, a <br /> report of findings- for the drilling of the soil borings, the monitoring well <br /> sampling, and the sampling near the railroad tracks will be prepared for client and <br /> agency review. The report will include: <br /> 20-3937-OIIMP960068 Page 4 of 10 - 01996,Kleirifelder, Inc. <br /> KLEINFELDER 2825 East Myrtle Street,Stockton,CA 95205-4794 (209)948-1345 (209)948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.