My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1265
>
2900 - Site Mitigation Program
>
PR0506292
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:01:08 PM
Creation date
5/13/2020 2:42:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506292
PE
2950
FACILITY_ID
FA0007328
FACILITY_NAME
EMPTY LOT
STREET_NUMBER
1265
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14327041
CURRENT_STATUS
02
SITE_LOCATION
1265 N SHAW RD
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 }PJ <br /> File No. 20-3937-01 <br /> June 21, 1996 _ <br /> A-4 GROUNDWATER MONI'CQBING <br /> A-4.1 Water Level Measurements <br /> Water level measurements are made in the wells prior to purging and sampling the <br /> wells. Measurement protocol is as follows: <br /> 1. The wells are opened and allowed to equilibrate with the atmosphere. <br /> 2. The water level probe is decontaminated in a trisodium phosphate wash, <br /> followed by a distilled-water rinse,prior to use in each well. <br /> 3. Water level measurements are made using a conductivity-based water-level <br /> meter. Depth-to-water is generally measured from a surveyed mark. on the <br /> north rim of the PVC well casing. <br /> The water level measurements are converted to elevations using the surveyed casing <br /> elevations. <br /> A-4.2 Groundwater Sampling <br /> Groundwater samples are. collected rfrom.the-monitoring rwells at the site. The <br /> sampling protocol for each Well is as follows: ` <br /> 1. Down-well equipment (pumps, bailers, etc.) is decontaminated by steam <br /> cleaning, or by scrubbing in a trisodium-phosphate wash followed .by a <br /> distilled water rinse, prior to use in each well. Bailer cord is replaced prior <br /> to use in each well. <br /> 2. The depth-to-water is measured using a conductivity-based water-level <br /> meter. t <br /> 3. The volume of water standing in the well is calculated by subtracting the <br /> depth-to-water measurement from the depth'of the well and multiplying by <br /> the appropriate conversion factor(3.14 *radius2). <br /> 4. Three to five well volumes of water are purged from each well using a <br /> submersible pump, bladder pump, or Teflon bailer. <br /> 5. Physical parameters (pH, electrical conductivity, and temperature) are <br /> monitored for stability during purging.' The physical parameter <br /> measurements are recorded on purge-and-sample logs, along with the-time <br /> and volume of water purged at each measurement. <br /> 20-3937-011UP960068 Page A-5 01996,Kleinfelder,Inc. <br /> KLEINFELDER 2825 East Myrtle Street,Stockton,CA 95205-4794 (209)948-1345 (209)948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.