Laserfiche WebLink
5.0 Schedule <br /> IT is prepared to initiate fieldwork (utility survey and drilling) pending Caltrans and Regulatory <br /> approval of the Workplan and health and safety plan. It is anticipated that the fieldwork for the <br /> task order can be completed in approximately two days. Samples will be submitted to the <br /> laboratory within 48 hours of collection. The laboratory analyses will be conducted on a normal <br /> turn around basis. Following receipt of all analytical data, it is anticipated that a draft report <br /> documenting the findings of the investigation will be submitted 10 working days after the <br /> completion of the work. <br /> M <br /> • <br /> i <br /> SAC/DP-N:4nncjPMrojeci.MM34760�wkpin&hsp\SR 120 wp.doc 5-1 <br /> WPM <br />