Laserfiche WebLink
Ground Zero Analysis, Inc. <br />HEALTH AND SAFETY PLAN <br />❑ Confined Space Entry Will not be performed during this investigation <br />❑ Other- explain hazard and mitigation <br />PERSONAL PROTECTIVE EQUIPMENT <br />As a minimum Level D protection is required on all GZA work sites. Level D includes: <br />❑ Steel toed boots <br />❑ Hard Hat <br />❑ Safety Glasses <br />❑ Hearing Protection <br />❑ Nitrile Gloves <br />For each task on this project identify additional protective garments as required and note the conditions under which the <br />level of PPE would be modified for each task. <br />Task(s) <br />Condition <br />Personnel <br />Garment(s) <br />1,2,3 <br />Working on-site <br />All <br />Orange/Bright Yellow Vests <br />SITE CONTROL AND COMMUNICATIONS <br />The buddy system must be used on all GZA hazardous waste sites. <br />Work Zones will be marked as follows: Cones, barricades and/or caution tape will be used to mark off <br />exterior work zones. <br />MARK WORK ZONES ON SITE MAP p CHECK WHENDONE. <br />On-site communications: ❑ Radio X Verbal ❑HandSignals ❑Other <br />PAGE <br />