Laserfiche WebLink
601193NS V <br /> December 28,2000 <br /> Page 2 of 3 <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL OUT AND MAIL NOTICE OF <br /> COMPLETION PROVIDED BY GRANTOR. <br /> Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State Standard Specifications <br /> Reference to Engineer in the State Standard Specifications shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, and Business and Professions <br /> Code, Section 8771. Permittee shall physically inspect the work site and locate survey monuments prior to work <br /> commencement. Monuments shall be referenced or reset in accordance with Business and Professions Code. <br /> A pre-job conference with the permittee, contractor, and State representative is required prior to start of work. <br /> Permittee shall contact the State representative and arrange the meeting. This meeting may be waived at the direction <br /> of the State representative. <br /> Permittee shall, prior to commencement of any work, provide the State representative with the name and phone <br /> number of the person in responsible charge of the work to be performed under this permit. <br /> Traffic control shall be done in conformance with Caltrans Manual of Traffic Controls 1996. <br /> In addition to General Provision 35, "Notification of department and TMC",the permittee shall notify the <br /> Department's representative AND THE TRANSPORTATION MANAGEMENT CENTER(TMC) immediately prior to <br /> initiating any traffic control and immediately upon the removal of any traffic controls. The telephone number <br /> for Caltrans District 10 TMC is (209) 948-7556. <br /> Except when necessary, as determined by the State representative, no installation, construction equipment, or personal <br /> vehicles shall operate or park within the traveled way. <br /> No cutting of pavement or improved shoulder is authorized under this permit. <br /> In addition to the attached General Provisions, the following special provisions are also applicable: <br /> 1. Unless specifically authorized elsewhere in this permit, survey work shall not be performed: <br /> A. On holiday(s) and a day preceeding holiday(s) <br /> B. In medians. <br /> C. When work requires traffic control on lanes. <br /> 2. Permittee shall furnish, place, and maintain required signs, safety equipment, and traffic control and warning devices <br /> in accordance with the Manual of Traffic Controls published by the Department of Transportation. <br /> 3. All personnel shall wear hard hats and orange vests, shirts or jackets as appropriate. <br /> 4. Unless specifically authorized in this permit, survey markings within the right of way shall be temporary. Paint used <br /> for markings shall be water-soluble and other markers shall be removed upon completion of survey. <br /> 5. Any collected survey data requested by Caltrans shall be furnished to Caltrans without charge. <br /> 6. Measurements across traffic lanes shall be made through the use of an electronic distance-measuring device <br /> utilizing non-visible light or other optical means. <br /> 7. Electromagnetic and radioactive equipment must be operated by certified personnel and shall not interfere with radio <br /> communications or be directed toward the traveling public. <br /> 8. Vehicles necessary for survey work may be parked in Sate Highway right of way off paved shoulders. Auxiliary <br /> support and employee vehicles shall remain outside the right of way. <br /> 9. Detonating explosive charges within State right of way is prohibited. <br /> 10. Permittee shall provide for the safe passage of pedestrians. <br /> 2 <br />