Laserfiche WebLink
. 02 June 2004 <br /> AGE-NC Project No 99-0645 <br /> Page 3 of 5 <br /> to an extent of 40 feet, VW lA was installed cast of the former UST area to 70 feet bsg, VW2 was <br /> installed east of the former UST area to 40 feet bsg and VW3 was installed south of well MW-3 to <br /> 60 feet bsg Soil samples were collected at five foot intervals, generally beginning at 10 feet bsg, or <br /> where native soil was encountered below back fill <br /> A total of 28 soil samples were analyzed Samples from B6'had concentrations ofBTEX compounds <br /> and MTBE above laboratory reporting limits MTBE ranged from 0 010 milligram per kilogram <br /> (mg/kg)to 0 63 mg/kg Maximum concentrations ofBTEX compounds were 0 020 mg/kg benzene, <br /> 0 060 mg/kg toluene,0 030 mg/kg ethylbenzene and 0 070 mg/kg xylenes The sample results from <br /> B7 showed only one sample contaminated,at 30 feet,with 0 49 mg/kg MTBE Samples from MW- <br /> 1 R had 12 mg/kg TPH-g at 40 feet, MTBE was detected at concentrations of 0 43 mg/kg and 1 2 <br /> mg/kg at 30 and 40 feet, respectively, TAME was detected at 30 and 40 feet, 1n concentrations of <br /> 0 040 mg/kg and 0 030 mg/kg, respectively <br /> Results from VW1A showed TPH-g and TAME at 40 feet with concentrations of 4 6 mg/kg and <br /> 0 O l Omg/kg,respectively MTBE was detected from 40 to 60 feet,ranging from 0 030 mg/kg to 4 2 <br /> mg/kg Soil from VW3 had MTBE at 30 and 40 feet with concentrations of 0 020 mg/kg and 0 060 <br /> mg/kg, respectively <br /> . Monitoring and vapor extraction wells were completed within the following intervals MW-1 R from <br /> 80 feet to 100 feet bsg, VW1B from 15 feet to 40 feet bsg, VW1A from 40 feet to 70 feet bsg, VW2 <br /> from 15 feet to 40 feet bsg, VW3 from 20 feet to 50 feet bsg <br /> MTBE was detected in the sample collected from well MW-1 at a concentration of 120 4g/1 <br /> SVE REMEDIATION FEASIBILITY PROCEDURES <br /> Two separate soil vapor extraction pilot tests were conducted on 18 September 2003 and 06 October <br /> 2003 On 18 September 2003, the upper sand layer was tested using vapor well VW1B, screened <br /> from 15 feet bsg to 40 feet bsg as the extraction well On 06 October 2003, a second pilot test was <br /> conducted on the fine-grained deeper impacted areas closest to ground water at the site using vapor <br /> well VW1A, screened from 40 feet bsg to 70 feet bsg as the extraction well The pilot tests were <br /> initiated at 8 00 am and continued for 8 hours A total of four soil vapor samples were collected <br /> during each pilot test <br /> Analytical results of soil vapor samples were generally highest in the second sample collected on 18 <br /> September Extraction well VW1B results indicated TPH-g was detected in all the soil vapor <br /> samples at concentrations ranging froml 1,000 µg/1 to 14,000 4g/1, benzene, toluene, ethylbenzenc <br /> and xylenes were detected in every sample at concentrations as high as 54 µg11 benzene, 1,400 µg/1 <br /> • Advanced GeoEnvi ron mental <br />