My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
5000
>
2900 - Site Mitigation Program
>
PR0545265
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2020 4:40:57 PM
Creation date
5/13/2020 4:01:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0545265
PE
2950
FACILITY_ID
FA0025736
FACILITY_NAME
SCK TAXIWAY D REBAB
STREET_NUMBER
5000
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
5000 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE PAGE <br /> This Health and Safety Plan (HASP) was prepared for employees performing field activities at <br /> Stockton Metropolitan Airport in Stockton, CA. It was prepared based on the best available <br /> information regarding the physical and chemical hazards known or suspected to be present <br /> at the project sites. While it is not possible to discover, evaluate, and protect in advance <br /> against all possible hazards that may be encountered during the completion of the project, <br /> adherence to the safety and health program requirements of this HASP will significantly reduce <br /> the potential for occupational injury. <br /> By signing below, I acknowledge that I have reviewed and hereby approve this HASP for the <br /> field activities at Stockton Metropolitan Airport in Stockton, CA. This HASP has been written <br /> for exclusive use by EnSafe Inc. employees and its subcontractors. This HASP was written <br /> for specified site conditions, dates, and personnel and must be amended if these conditions <br /> change. <br /> Plan Preparer: <br /> Date: January 27, 2020 <br /> La. Tiffany Thomas, PhD <br /> Chief Chemist/Sr. Project Director <br /> EnSafe Inc. <br /> Plan Review: <br /> Date: January 27, 2020 <br /> 1.b. David Dunbar <br /> Senior Project Director/Branch Manager <br /> EnSafe Inc. <br /> ENGINEERING I ENVIRONMENT I HEALTH &SAFETY TECHNOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.