My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_HISTORICAL GROUNDWATER ELEVATIONS & ANALYTICAL RESULTS (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
33 (STATE ROUTE 33)
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
ARCHIVED REPORTS_HISTORICAL GROUNDWATER ELEVATIONS & ANALYTICAL RESULTS (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:59:13 AM
Creation date
5/14/2020 12:19:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
HISTORICAL GROUNDWATER ELEVATIONS & ANALYTICAL RESULTS
RECORD_ID
PR0506447
PE
2960
FACILITY_ID
FA0007429
FACILITY_NAME
CROP PRODUCTION SERVICES VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
STATE ROUTE 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
01
SITE_LOCATION
35100 S HWY 33
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
734
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE WELL TIME TOC DTW ELEVATION GRADIENT MAGNITUDE NOT source <br /> 25-Feb-08 E-1 27.4 53.85 -26.45 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 E-2 28.97 53.25 -24.28 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-1 26.94 51.6 -24.66 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-10 27.48 52.15 -24.67 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-12 24.16 49.45 -25.29 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-13a 29.07 49.48 -20.41 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-13b 29.03 53.49 -24.46 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-14a 28.69 53.55 -24.86 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-14b 28.71 53.63 -24.92 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-15a 27 0 0 Well paved over. Blaine Tech Field Notes <br /> 25-Feb-08 MW-15b 26.82 0 0 Well paved over. Blaine Tech Field Notes <br /> 25-Feb-08 MW-16a 25.93 51.6 -25.67 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-16b 26.06 51.45 -25.39 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-17a 24.62 0 0 Well paved over. Blaine Tech Field Notes <br /> 25-Feb-08 MW-17b 24.4 0 0 Well paved over. Blaine Tech Field Notes <br /> 25-Feb-08 MW-18a 27.76 52.85 -25.09 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-18b 27.69 52.8 -25.11 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-19a 23.15 48.75 -25.6 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-19b 23.15 48.85 -25.7 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-2 25.96 49.55 -23.59 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-20a 23.19 48.6 -25.41 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-20b 23.2 48.6 -25.4 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-21 22.89 48.8 -25.91 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-3 25.93 50.81 -24.88 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-5 25.91 50.95 -25.04 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-6 27.44 50.9 -23.46 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-7 28.72 54.23 -25.51 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-8 27.12 53.1 -25.98 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 MW-9 24.95 49.9 -24.95 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 PM-1 24.85 51.2 -26.35 0 0 Blaine Tech Field Notes <br /> 25-Feb-08 PM-2 25.03 51.5 -26.47 0 0 Blaine Tech Field Notes <br /> 06-Dec-07 E-1 27.4 56.13 -28.73 Blaine Tech Field Notes <br /> 06-Dec-07 E-2 28.97 57.2 -28.23 Blaine Tech Field Notes <br /> 06-Dec-07 MW-8 27.12 56.2 -29.08 Blaine Tech Field Notes <br /> 06-Dec-07 PM-1 24.85 54.51 -29.66 Blaine Tech Field Notes <br /> 06-Dec-07 PM-2 25.03 54.7 -29.67 Blaine Tech Field Notes <br /> 16-Jul-07 E-1 27.4 51.84 -24.44 Blaine Tech Field Notes <br /> 16-Jul-07 E-2 28.97 52.83 -23.86 Blaine Tech Field Notes <br /> 16-Jul-07 MW-1 26.94 50.49 -23.55 Blaine Tech Field Notes <br /> 16-Jul-07 MW-10 27.48 50.82 -23.34 Blaine Tech Field Notes <br /> 16-Jul-07 MW-12 24.16 48.77 -24.61 Blaine Tech Field Notes <br /> 16-Jul-07 MW-13A 29.07 53.1 -24.03 Blaine Tech Field Notes <br /> 16-Jul-07 MW-13B 29.03 53.07 -24.04 Blaine Tech Field Notes <br /> 16-Jul-07 MW-14A 28.69 52.44 -23.75 Blaine Tech Field Notes <br /> 16-Jul-07 MW-14B 28.71 52.63 -23.92 Blaine Tech Field Notes <br /> 16-Jul-07 MW-15A 27 Well paved over. Blaine Tech Field Notes <br /> 16-Jul-07 MW-15B 26.82 Well paved over. Blaine Tech Field Notes <br /> 16-Jul-07 MW-16A 25.93 50.39 -24.46 Blaine Tech Field Notes <br /> 16-Jul-07 MW-16B 26.06 50.66 -24.6 Blaine Tech Field Notes <br /> 16-Jul-07 MW-17A 24.62 Well paved over. Blaine Tech Field Notes <br /> 16-Jul-07 MW-17B 24.4 Well paved over. Blaine Tech Field Notes <br /> 16-Jul-07 MW-18A 27.76 51.16 -23.4 Blaine Tech Field Notes <br /> 16-Jul-07 MW-18B 27.69 51.13 -23.44 Blaine Tech Field Notes <br /> 16-Jul-07 MW-19A 23.15 47.76 -24.61 Blaine Tech Field Notes <br /> 16-Jul-07 MW-19B 23.15 47.9 -24.75 Blaine Tech Field Notes <br />
The URL can be used to link to this page
Your browser does not support the video tag.