My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SPRECKELS
>
18800
>
2900 - Site Mitigation Program
>
PR0506460
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 1:19:31 PM
Creation date
5/14/2020 12:33:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506460
PE
2950
FACILITY_ID
FA0007440
FACILITY_NAME
ATHERTON KIRK/SPRECKELS
STREET_NUMBER
18800
STREET_NAME
SPRECKELS
STREET_TYPE
RD
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
18800 SPRECKELS RD
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 i <br /> SH KLEINFELDER <br /> File No. 20-3978-01.W 13 <br /> January 22, 1997 <br /> with a trisodium phosphate or non-phosphate detergent wash and rinsed with distilled <br /> water prior to collecting each soil sample. <br /> B-2.8 Soil Boring Closure and Cutting Disposal <br /> Soil borings are closed immediately after the collection and logging of soil samples. <br /> Closure is accomplished by grouting the boring with a cement/bentonite slurry or as <br /> otherwise required. <br /> Drill cuttings will be placed in 55-gallon drums wrapped in plastic or spread around the <br /> boring and left on site for disposal by the site owner. If requested, Kleinfelder can <br /> coordinate disposal of soil and water after analytical results are available. <br /> B-3 GROUNDWATER WELL INSTALLATION <br /> B-3.1 Monitoring Well Construction <br /> Construction details for shallow groundwater monitoring wells are as follows: <br /> • The well casing are 2- or 4-inch inside diameter, flush threaded joint, schedule 40 <br /> PVC pipe. <br /> • The wells are constructed in 8- or 10-inch diameter borings. <br /> • Well screen sections are perforated with 0.010- or 0.020-inch factory-cut slots. <br /> • The wells are generally screened from 5 feet above to 15 feet below first <br /> groundwater. The screen length is reduced if an aquitard with a minimum <br /> thickness of 5 feet is encountered. If an apparent aquitard is encountered, the well <br /> is usually terminated l to 2 feet into the aquitard. Effort is made not to screen <br /> across two aquifers. If confined aquifer conditions or high vadose zone <br /> contamination are encountered, the well screen is usually not set above the depth <br /> of first encountered groundwater. Wells are usually not set in areas of suspected <br /> significant soil contamination. <br /> • The PVC pipe and end caps are steam cleaned prior to installation. <br /> The annular space between the screen and the wall of the boring is backfilled with <br /> the appropriate clean sand to approximately 2 feet above the top of the perforated <br /> sections. Based on soil logs or a sieve test, modifications may be made regarding <br /> the size of sand to be used. Installation of the sand may require that the sand be <br /> tremmied, using clean water. <br /> 20-3978-01,W131207PE030 Page 8-4 ©1997, Kleinfelder, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.