Laserfiche WebLink
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. <br /> FOR <br /> FOX VALLEY CORPORATION <br /> AND <br /> FOX RIVER PAPER COMPANY <br /> RIPON MILL <br /> SAN JOAQUIN COUNTY <br /> Existing monitoring wells show that the past discharge from the Ripon Mill has degraded ground <br /> water quality. The Discharger has made substantial improvements in the quality of waste water T <br /> which it discharges. This is a Corrective Action monitoring program,the purpose of which is to <br /> determine whether measures taken by the Discharger are sufficient to clean up the effects of past <br /> waste discharges to ground water and to determine if the continued discharge of waste water to E <br /> land needs to be contained in a waste management unit described in California Code of <br /> Regulations,Title 23,Division 3, Chapter 15 (Chapter 15). Currently the discharge is not <br /> classified as a designated waste due to analysis and certification by David A. Lawrence, C.E.G. N <br /> 618. This monitoring program will serve to verify that decision. <br /> REPORTING T <br /> In reporting the monitoring data,the Discharger shall arrange the data in tabular or graphical form <br /> so that the date,the constituents, and the concentrations are readily discernible. The data shall be A <br /> summarized in such a manner to illustrate clearly the compliance with waste discharge <br /> requirements. <br /> Monthly monitoring reports shall be submitted to the Regional Board by the 20th day of the T <br /> following month. Quarterly monitoring reports shall be submitted to the Regional Board by the <br /> 20th day of the following month following the end of the quarter. I <br /> The results of any monitoring done more frequently than required at the locations specified in the <br /> Monitoring and Reporting Program shall be reported to the Board. V <br /> Upon written request of the Board, the Discharger shall submit a report to the Board by <br /> 30 January of each year. The report shall contain both tabular and graphical summaries of the E <br /> monitoring data obtained during the previous year. In addition, the Discharger shall discuss the <br /> compliance record and the corrective actions taken or planned which may be needed to bring the <br /> discharge into full compliance with the waste discharge requirements. <br /> WATER SUPPLY MONITORING <br /> A sampling station shall be established where a representative sample of the process water supply <br /> can be obtained. Water supply monitoring should include process Wells Nos. 4, 5, 6, 7, and 8. <br /> Water supply monitoring shall include at least the following: <br /> Sampling <br /> Constituents Units Frequency <br /> Standard Minerals mg/l Annually <br /> Electrical Conductivity µmhos/cm Annually <br /> @ 25°C <br /> Total Dissolved Solids mg/1 Annually <br />