Laserfiche WebLink
0 <br /> Mr. Dennis Abrahamson Attachment A <br /> Simpson Paper Company Page 7 of 7 <br /> Ripon, CA February 29, 1988 <br /> VI. COSTS <br /> --------------------------------------------------------------- <br /> Item Units Quantity $/Unit Total $ <br /> --------------------------------------------------------------- <br /> LABOR <br /> Drilling and monitoring <br /> Principal Hr 64 65.00 4160.00 <br /> Associate geologist Hr 70 50.00 3500.00 <br /> Write monitoring plan for State <br /> Principal Hr 34 65.00 2210 .00 <br /> Basic data report to State <br /> Principal Hr 32 65.00 2080.00 <br /> Associate Hr 16 50.00 800.00 <br /> Analysis report <br /> Principal Hr 32 65.00 2080.00 <br /> $14,830.00 <br /> EXPENSES <br /> Drilling rig Hr 64 125.00 8000.00 <br /> Rig mobilization Miles 400 1 . 75 700.00 <br /> 2-in PVC blank casing Ft 385 2. 16 831 . 60 <br /> 2-in PVC screen Ft 380 2. 51 953 .80 <br /> 2-inch steel risers Each 17 23.00 391 .00 <br /> 2-inch galv caps Each 17 2. 67 45.39 <br /> 2-inch PVC end caps Each 17 2. 00 34.00 <br /> Centering guides Each 34 4.00 136.00 <br /> 2-inch PVC female adapters Each 17 2.00 34.00 <br /> Gravel pack Load 1 140. 00 140. 00 <br /> Cement grout Bag 170 4.00 680.00 <br /> Per diem Day 21 45.00 945.00 <br /> Mileage Miles 2400 .25 600.00 <br /> Datalogger, transducers, .00 <br /> conductivity probe Days 6 100.00 600. 00 <br /> Printing and binding of <br /> reports l. s. 1 50.00 50 .00 <br /> Well permits <br /> Chemical analyses <br /> Survey well-head elevations <br /> $14 , 140.79 <br /> $28, 970. 79 <br /> * To be paid directly by Simpson Paper Company <br /> 7 <br />