My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2200 - Hazardous Waste Program
>
PR0513732
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2020 4:00:08 PM
Creation date
5/14/2020 3:17:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0513732
PE
2228
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
01
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Panella Trucking INC, 5000 East Fremont Street, Stockton, CA 95215 <br /> Waste Oil Tank Assessment Report <br /> Comments: <br /> Not applicable, not a new tank system. <br /> The tank systems or components are not in contact with soil. The tank is on a concrete floor with <br /> secondary containment berm around the tank. <br /> (a)(4))--Not Applicable if this is an above ground tanks stem. <br /> Comments: N/A <br /> and <br /> (a)(5)—Design considerations to ensure that: <br /> A) Tank foundations will maintain the load of a full tank <br /> B) Tank systems will be anchored to prevent floatation or dislodgement where the tank <br /> system is placed in a saturated zone, or is located within a seismic fault zone <br /> C Tanks stems will withstand the effects of frost heave <br /> Comments: N/A <br /> The AST at this facility meets all of these criteria listed in the section(a)(5). <br /> The tank was installed per manufacturer's installations instructions. The tank is anchored to the concrete <br /> slab with anchor bolts. <br /> Title 22 CCR, 66265.192(b)(1-6)-- Independent, qualified professional engineer's inspection for the <br /> presence of the following after installation: <br /> 1)Weld breaks; <br /> 2) Punctures; <br /> 3) Cracks; <br /> 4) Corrosion; <br /> 5) Other structural damage or inadequate construction or installation. <br /> Comments: <br /> The Professional Engineer has confirmed that the integrity of the AST at this facility has not been <br /> compromised by any of the above-mentioned conditions. <br /> Title 22 CCR, 66265.192(d)--All new tanks and ancillary equipment shall be tested for tightness <br /> prior to being laced in use. <br /> Comments: <br /> Not applicable; not a new tank. <br /> There are no documents on site to verify if there was any prior testing done to this AST. <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.