Laserfiche WebLink
Panella Trucking INC, 5000 East Fremont Street, Stockton, CA 95215 <br /> Waste Oil Tank Assessment Report <br /> Comments: <br /> Not applicable, not a new tank system. <br /> The tank systems or components are not in contact with soil. The tank is on a concrete floor with <br /> secondary containment berm around the tank. <br /> (a)(4))--Not Applicable if this is an above ground tanks stem. <br /> Comments: N/A <br /> and <br /> (a)(5)—Design considerations to ensure that: <br /> A) Tank foundations will maintain the load of a full tank <br /> B) Tank systems will be anchored to prevent floatation or dislodgement where the tank <br /> system is placed in a saturated zone, or is located within a seismic fault zone <br /> C Tanks stems will withstand the effects of frost heave <br /> Comments: N/A <br /> The AST at this facility meets all of these criteria listed in the section(a)(5). <br /> The tank was installed per manufacturer's installations instructions. The tank is anchored to the concrete <br /> slab with anchor bolts. <br /> Title 22 CCR, 66265.192(b)(1-6)-- Independent, qualified professional engineer's inspection for the <br /> presence of the following after installation: <br /> 1)Weld breaks; <br /> 2) Punctures; <br /> 3) Cracks; <br /> 4) Corrosion; <br /> 5) Other structural damage or inadequate construction or installation. <br /> Comments: <br /> The Professional Engineer has confirmed that the integrity of the AST at this facility has not been <br /> compromised by any of the above-mentioned conditions. <br /> Title 22 CCR, 66265.192(d)--All new tanks and ancillary equipment shall be tested for tightness <br /> prior to being laced in use. <br /> Comments: <br /> Not applicable; not a new tank. <br /> There are no documents on site to verify if there was any prior testing done to this AST. <br /> Page 3 of 6 <br />