Laserfiche WebLink
COMMENTS ON DEVELOPMENTS <br /> UP-90-16 <br /> 4 . The frontage improvements for Lower Sacramento Road shall be <br /> constructed in conformance with standards for one-half of a <br /> 110-foot right-of-way City of Lodi street . The construction <br /> of the frontage improvements will be deferred , upon execution <br /> by the owner of a Deferred Frontage Improvement Agreement <br /> prior to approval of the Improvement Plan . ( A $250 . 00 fee is <br /> required for processing per Ord . No . 3337 in addition to a <br /> copy of the Grant Deed and an Engineer ' s estimate with a <br /> typical section drawing of the required frontage improvements <br /> on a form to be supplied by the Public Works Department . ) <br /> S . A Traffic Impact Mitigation Fee may be required for this <br /> development . (The fee is $6 , 126 . 00 per 1 , 000 gross square <br /> foot of building as "Retail /Service" in the Lodi area . The <br /> fee shall be automatically adjusted annually by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record . ) Collection of the fee will be <br /> effective on April 23 , 1990, and the Improvement Plan not <br /> approved prior to this date will be subject to the fee . <br /> c : Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />