Laserfiche WebLink
r <br /> OPERATION CHARACTERISTICS <br /> Describe any processing to be done on-site:_ No actual processing done <br /> on site. <br /> List type of equipment or machinery used in the project and method <br /> of excavation: Scraper, water truck, motor grader, and loader (2 yard bucket) <br /> List equipment or processes used in this project that generate air <br /> pollutants or required an Air Pollution Control District permit : <br /> Exhaust emmissions typical of these 4 nieces of enLi_pmentwill he oenerated. <br /> This is not something out of the ordinary_ <br /> List any operations which will cause noise or vibration: <br /> The only noise associated with this grading excavation will come from the <br /> scraper, water truck, motor grader and the leader. <br /> Describe any trees or vegetation be removed: The deceased trees will <br /> be removed from the excavation area over a 5 year period as shown on the <br /> Topographic map. <br /> List all noxious weeds on the site: None <br /> Where will materials be stockpiled:_ One stockpile is located on the <br /> eastern side of this site along McKinley and a second stockpile is located <br /> in the eastern half of this site as noted on the plan. <br /> REHABILITATION PLAN <br /> Proposed final use of the site ( crops, irrigation methods, etc. ) : <br /> Cattle grazing and cattle feed lot with wood chip recycling as shown <br /> on plan. <br /> Tomatoe waste and the coffee <br /> Will the topsoil be replaced? Yes Q No Q grounds will be worked into the <br /> soil to enhance it' s fertility. <br /> If no, attach a soils report prepared by a qualified soil scientist. <br /> Describe any changes in irrigation systems : See plan <br /> Describe measures to stabilize slopes: The proposed pasture grass will <br /> provide sufficient slope stabilization, <br /> Grading Excavation - 9 - (7/84 ) <br />