My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BENJAMIN HOLT
>
2908
>
2300 - Underground Storage Tank Program
>
PR0231021
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/24/2020 9:58:32 AM
Creation date
5/14/2020 4:33:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231021
PE
2361
FACILITY_ID
FA0003625
FACILITY_NAME
ARCO STATION #83560*
STREET_NUMBER
2908
Direction
W
STREET_NAME
BENJAMIN HOLT
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
09763032
CURRENT_STATUS
01
SITE_LOCATION
2908 W BENJAMIN HOLT DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 4 of s) <br /> XIII . VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> A ❑ I B ❑ C ❑ D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify). <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify): <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. <br /> Vapor Recovery Piping Containment Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Interstitial Communication Verification Method Used : <br /> NA-Section III -No Vapor Recovery Piping Containment at this UST Facility . <br /> XIV, COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III -No Vapor Recovery Piping Containment at this UST Facility . <br />'r <br /> I <br /> i <br /> I <br /> XV. TURBINE / PRODUCT PIPING SUMP TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Unknown Fiberglass A ❑x B 0 C ❑x D ❑ <br /> A ❑ I B ❑ I C ❑ I D ❑ <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> Engineered Method (Specify) : Caldwell Systems/ Hydrostatic 30 Minutes <br /> # of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Turbine / Product Piping Sump Testing Training and Certifications (List applicable certifications.) Expiration Date <br /> Caldwell Level Change Indicator 7/5/2020 <br /> ICC Service Technician #5246802 - UT 3/21 /2021 <br /> underground Storage Tank Tester License #90 - 1120 12/31 /2022 <br /> XVI , COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-Summery of Secondary Containment Test Results . Not Tank D present at this UST Facility. <br /> ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.