Laserfiche WebLink
Seismic/Anchoring: <br /> See Attachment# 1 <br /> Seismic/Anchoring findings:The tank as designed and operated, and the <br /> containment area in which it is located are adequately anchored and are <br /> seismicallt sound. Initials: <br /> Leak Test: <br /> See Attachment#2 <br /> Integrity Testing findings: Based on the above noted integrity test and the <br /> results obtained from that test,the tank has sufficient integrity for its intended <br /> use. Initials: <br /> A64— <br /> Tank Drawing: <br /> See Attachment#3 <br /> Tiger Lines Used Motor Oil <br />