Laserfiche WebLink
Pep Boys#711 <br /> ASSESSMENT,continued <br /> 7. Stray electric current <br /> 8. Existing corrosion-protection measures <br /> And <br /> B)Type and degree of external corrosion that are needed consisting of one or more of the <br /> following: <br /> 1. Corrosion-resistant materials (i.e.fiberglass) <br /> 2. Corrosion-resistant coating with cathodic protection <br /> 3. Electrical isolation devices <br /> This section not applicable. The tank is above ground and inside a structure. It is not in contact <br /> with soil or water. <br /> (a)(4) -- Not Applicable if this is an above ground tank system. The subject tank is an above <br /> ground tank. <br /> (a)(5) --Design considerations to ensure that: <br /> A) Tank foundations will maintain the load of a full tank.See calculations in <br /> Appendix B. <br /> B)Tank systems will be anchored to prevent floatation or dislodgement where the tank system <br /> is placed in a saturated zone, or is located within a seismic fault zone. The tank is not in a <br /> saturated zone.See seismic calculations in Appendix B. <br /> C)Tank systems will withstand the effects of frost heave. <br /> Title 22, 66265.192(b) (1-6)Not applicable. The tank is at a low elevation in California in an <br /> area not subject to frost heave. <br /> --Independent, qualified professional engineer's inspection for the presence of the following <br /> after installation; <br /> 1) Weld breaks.See Table IV. <br /> 2) Punctures.See Table IV. <br /> 3) Cracks.See Table IV. <br /> 5 <br />