My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 3:54:42 PM
Creation date
5/15/2020 2:43:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form 2020 <br /> 10 . MONITORING SITE PLAN <br /> Date site plan was prepared: 10/7/2020 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form . The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Sde Addre=_s : Charter Way Chevron 508 W Charter Way Stockton, CA 95706 <br /> . _ . . . . <br /> KEY _ <br /> A = ANnTL.+.& SensorTLS *PIPLNG * <br /> F = FILLS (ARROWS) <br /> A' = VAPOR Store Draw-ine of <br /> P = PROBE piping esit of <br /> L = Turbine ( Leak Detector stump and UDC's. <br /> % = SUJIP SENSOR No underground <br /> B = Brine Sensor drawing is <br /> S = Smarit Sensor accurate, we <br /> C = Floats & Chain cannot speculate <br /> E = E Stop blue prints. <br /> . . . _ . . <br /> C c . . . . . . . . . 87 <br /> �-/ 00 <br /> 91 � J �J O <br /> C c . . <br /> O <br /> Charter Way <br /> _4rts• irenurnrlergr-ornrfrimsare rulfsibletoO cerr[�irrgrximicianra•ea <br /> p of ssiotrrl opiraat orad ntzics a sole$ J'a it ornnria:rl prn�rz� . Drmrhig <br /> r»t to scde <br /> Date map was drawn 10,17120 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monlaring lank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space proVded, note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.