Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page; 5 of 6) <br /> XVI. - LINE LEAK DETECTOR TESTING <br /> r Check this box if line leak detectors (LLD) are NOT installed . (Do not complete this section .) Y N NA <br /> This section must be completed if LLDs are installed . <br /> Was a leak simulated to verify LLD performance? r' r r <br /> (Check all that apply.) Simulated leak rate verified : 3 GPH r 1 . 1 GPH r 0 . 2 GPH <br /> Was the testing apparatus properly calibrated ? r r r <br /> For emergency generator tank systems , does the LLD create an audible and visual alarm when a leak is detected ? r r r <br /> For mechanical LLDs , does the LLD restrict the flow through the pipe when a leak is detected ? r r r <br /> For electronic LLDs , does the turbine automatically shut off when a leak is detected ? r r r <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? r r <br /> For electronic LLDs , does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? r r <br /> For electronic LLDs , have all accessible wiring connections been visually inspected for kinks and breaks? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed? r r r <br /> Were all LLDs confirmed operational within regulatory requirements? I r r r <br /> For any answer of "N" above, describe in section X111 how and when these issues were or will be corrected. <br /> X111. COMMENTS <br /> XIV. VACUUM / PRESSURE/ HYDROSTATIC MONITORING ' EQUIPMENT TESTING <br /> r' Check this box if VPH monitoring is NOT used . (Do not complete this section.) <br /> This section must be completed if VPH monitoring is used to perform leak detection monitoring . <br /> System Type (Mark all that apply . ) r Vacuum I - Pressure r Hydrostatic <br /> Sensor lD Component(s) Monitored by this Sensor ` Sensor Functionality Interstitial Communication <br /> Test Test <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> I' Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> r Pass r Fail r Pass r Fail <br /> How was interstitial communication verified? r Simulated leak at far ends of the interstitial space . 17, Inspection <br /> r Other (Describe the method in section XV below.) r Gauge <br /> Was the vacuum or pressure restored to operating levels in all interstitial spaces? r Yes r No (Describe the reason in section XV below.) <br /> For any answer of "N " above, describe in section Xlll how and when these issues were or will be corrected. <br /> XV. COMMENTS <br /> GPH = Gallons per hour, Y = Yes , N = No , NA = Not applicable , VPH = Vacuum/Pressure/Hydrostatic , ID = Identification <br /> I <br /> i <br />