Laserfiche WebLink
Martinez, Genesis [EHD] <br />From: <br />Martinez, Genesis [EHD] <br />Sent: <br />Tuesday, November 24, 2020 8:54 AM <br />To: <br />Engineering Division; EH -UST <br />Cc: <br />Vang-Lee, Vicky [EHD] <br />Subject: <br />RE: Inspection Scheduling. <br />Hi James, <br />Thank you for the email. I have logged your appointment and will forward it to the area inspector. An inspector will <br />only contact you if there is a conflict. <br />Please note our email address has changed to ust@sigov.org <br />Germs Mao-h:A z I Office Assistant <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Ave. Stockton, CA 95205 <br />M (209) 468-02178 (209) 468-34331 D-� gmartinez@sigov.org <br />EHD Website: https://www.sigov.org/department/envhealth/ <br />From: Engineering Division<enginee ringdivision@Icservices.com> <br />Sent: Tuesday, November 24, 2020 8:40 AM <br />To: EH -UST <ust@sjgov.org> <br />Cc: Vang-Lee, Vicky [EHD] <vvang-lee@sjgov.org> <br />Subject: Inspection Scheduling. <br />CAUTION: This email is originated from outside of the organization. Do not click links or open attachments unless you recognize the <br />sender and know the content is safe. <br />We would like to schedule these days and times for 4627 Da Vinci. <br />For Removal (SR0081819) at this location We are looking at December 11t @ 9:00 AM <br />For Install (SR0079419) at this location were are looking at December 4th @ 9:00 AM <br />Primary Piping: Dec 9th at 9:00 AM <br />Secondary Piping: December 10th at 9:00 AM <br />I understand there are some requirements before we schedule the final. We are on a 21 day schedule with 7- <br />11 and would like our final to be on : December 22nd at 9:00 AM <br />Best, <br />James Otto <br />LC Services - Engineering Division <br />3887 N. Valentine Ave. <br />Fresno, Ca. 93722 <br />Phone: (559)444-1730 <br />Email: eneineerinedivision@Icservices.com <br />Website: www.Icservices.com <br />