My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 12:50:49 PM
Creation date
5/15/2020 4:19:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71SO-TOOL PROCEDURE BELOW, <br />FOR 71SO-TOOLC, SEE PAGE 9 <br />STEP 9A: INSERT 71SO-TOOL OVER INLET <br />TUBE <br />To install the 71 SO -TOOL (sold separately) over the <br />inlet tube, first loosen all three knobs, so the tool can <br />pass freely over the inlet tube flange. Align the slot <br />on the tool with the key on the inlet tube and insert <br />the tool down. See Figure 9A. <br />Tool slot Loosen all Hand <br />knobs View holes tighten <br />knobs <br />evenly <br />0 <br />O <br />Inlet <br />Tube <br />key <br />Figure 9A Figure 10A <br />STEP 10A: TIGHTEN THE 71SO-TOOL <br />Use the three view holes to ensure that the tool <br />seats out flat against the top of the inlet tube. To <br />prevent vertical movement of the tool during drilling <br />hand tighten all three knobs evenly the upper drop <br />tube. See Figure 10A. <br />STEP 11A: PREPARE DRILL AND BIT <br />Confirm that the stop on the 3/16" drill bit supplied <br />with the 71SO-TOOL is in the correct position before <br />drilling. The stop is factory installed at a distance <br />between 2" to 2-1/16" from the tip with the 71 SO - <br />TOOL. If the stop is not at the correct position it <br />must be fixed before drilling. <br />.: <br />Caution: If the drill stop is not in the proper <br />location failure of a pressure decay leak test may <br />result. <br />71 SO -TOOL <br />C <br />Tip to stop dimension <br />must be 2 to 2-1/16 inch <br />Figure 11A <br />STEP 12A: DRILL HOLES <br />With the inlet tube and 71SO-TOOL in place, <br />carefully drill a 3/16" diameter hole in the upper tube <br />using the drill bushing in the knob as a guide. The <br />drill stop is positioned so it will bottom out against <br />the knob after the bit has drilled through the upper <br />drop tube. If the stop is positioned wrong either no <br />hole will be drilled, or a through hole could <br />potentially be drilled through the inlet tube. If no <br />hole is drilled return to step 11 and check the stop <br />dimension. If a hole is drilled through the inlet tube <br />or into the screw hole the assembly is not <br />salvageable. Drill (2) more holes in the two <br />remaining knobs. <br />Figure 12A <br />Drill thru upper <br />tube only <br />
The URL can be used to link to this page
Your browser does not support the video tag.