My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 12:50:49 PM
Creation date
5/15/2020 4:19:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 23: CHECK INSTALLATION <br />Insert the drop tube all the way into the tank until the <br />flange and gasket seat onto the top of the Face Seal <br />Adaptor. The float will swing out into the operating <br />position as it passes into the tank. <br />Figure 23 <br />Make sure that the float is aligned along the length <br />of the tank. The length of the tank can easily be <br />determined by locating other manholes or pump <br />boxes that are installed around other tank fittings. <br />Look into the drop tube and align the deflector with <br />the length of the tank. <br />CAUTION: No obstruction in the tank can be within <br />14" from the center of the riser pipe or the valve may <br />not operate properly (See Figure 24). <br />STEP 24: ALIGN VALVE <br />Install the OPW Jack Screw Kit and a 4" NPT nipple <br />to lock the valve in place. Refer to the Installation <br />Instructions supplied with the Jack Screw Kit. Install <br />the Rotatable Product Adaptor (Refer to Installation <br />Instructions supplied with the Product Adaptor.) <br />Make sure that the valve does not rotate while <br />tightening the adaptor by observing the position of <br />the deflector. The valve must remain aligned <br />along the length of the tank as in Step 23. <br />Repeat this step as necessary to assure proper <br />valve alignment. <br />72 <br />Vapor Recovery Fill Riser <br />Riser <br />J IL <br />6" Max. <br />OPW <br />Ball Float <br />14" Minimum <br />Clearance for <br />Float <br />Tube Cut <br />per Local <br />Requirements <br />6" 1 <br />FAlign Float Along Length of Tank �P- <br />Figure 24 <br />Figure 24A <br />
The URL can be used to link to this page
Your browser does not support the video tag.