My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DA VINCI
>
4627
>
2300 - Underground Storage Tank Program
>
PR0231074
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 12:50:49 PM
Creation date
5/15/2020 4:19:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231074
PE
2351
FACILITY_ID
FA0002541
FACILITY_NAME
7-ELEVEN INC #20632
STREET_NUMBER
4627
STREET_NAME
DA VINCI
STREET_TYPE
DR
City
STOCKTON
Zip
95207
APN
11002003
CURRENT_STATUS
01
SITE_LOCATION
4627 DA VINCI DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec. 22nd (Or 23rd) @ 9:00 <br />Final inspection <br />q, r <br />Best, <br />James Otto <br />LC Services - Engineering Division <br />3887 N. Valentine Ave. <br />Fresno, Ca. 93722 <br />Phone: (559)444-1730 <br />Email: engineerinedivision@lcservices.com <br />Website: www.Icservices.com <br />From: Rivera, Stacy [EHDI <br />Sent: Wednesday, November 25, 2020 1:53 PM <br />To: Engineering Division <br />Cc: Vang-Lee, Vicky f EHDI <br />Subject: RE: Tank Pull and Set Dates and Times 7-11 #20632 Stockton - 4627 DaVinci Dr. 95207 <br />Based on our conversation today, here is the inspection schedule we decided on. All items are from condition #5 of the <br />approval letter. I've attached a copy for quick reference. Please email the dates and times of inspections to our UST <br />email at ust@sigov.org for scheduling — no inspections specifics are needed since we have them below. Please note, the <br />final inspection will be scheduled tentatively and will be cancelled if the requirements of condition #7 (as-builts, <br />installation checklists, designated operator training, approved CERS submittal) have not been completed prior to the <br />inspection. <br />Dec. 15Y <br />Tank removal <br />Dec. 4th <br />Tank set <br />a, b, c <br />Dec. 9th <br />Primary piping <br />d <br />Dec. 10th <br />Secondary containment <br />e, f, g, h, j <br />Dec. 18th <br />ELD & Pre -fuel <br />k, 1, m, n,o,p <br />Dec. 21St <br />Probable fuel delivery <br />Dec. 22nd (or 23rd) <br />Final inspection <br />q, r <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.