Laserfiche WebLink
Dec. 22nd (Or 23rd) @ 9:00 <br />Final inspection <br />q, r <br />Best, <br />James Otto <br />LC Services - Engineering Division <br />3887 N. Valentine Ave. <br />Fresno, Ca. 93722 <br />Phone: (559)444-1730 <br />Email: engineerinedivision@lcservices.com <br />Website: www.Icservices.com <br />From: Rivera, Stacy [EHDI <br />Sent: Wednesday, November 25, 2020 1:53 PM <br />To: Engineering Division <br />Cc: Vang-Lee, Vicky f EHDI <br />Subject: RE: Tank Pull and Set Dates and Times 7-11 #20632 Stockton - 4627 DaVinci Dr. 95207 <br />Based on our conversation today, here is the inspection schedule we decided on. All items are from condition #5 of the <br />approval letter. I've attached a copy for quick reference. Please email the dates and times of inspections to our UST <br />email at ust@sigov.org for scheduling — no inspections specifics are needed since we have them below. Please note, the <br />final inspection will be scheduled tentatively and will be cancelled if the requirements of condition #7 (as-builts, <br />installation checklists, designated operator training, approved CERS submittal) have not been completed prior to the <br />inspection. <br />Dec. 15Y <br />Tank removal <br />Dec. 4th <br />Tank set <br />a, b, c <br />Dec. 9th <br />Primary piping <br />d <br />Dec. 10th <br />Secondary containment <br />e, f, g, h, j <br />Dec. 18th <br />ELD & Pre -fuel <br />k, 1, m, n,o,p <br />Dec. 21St <br />Probable fuel delivery <br />Dec. 22nd (or 23rd) <br />Final inspection <br />q, r <br />4 <br />