Laserfiche WebLink
Underground Storage Tank <br />Monitoring System Certification Form <br />7. LINE LEAK DETECTOR TESTING <br />LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section. ) <br />Simulated release rate verified: (Check all that apply.) <br />®3 GPH LJ 0.1 GPH Ll 0.2 GPH <br />Yes <br />Na <br />I <br />Has the testing apparatus been properly calibrated? <br />regular <br />® <br />0 <br />For emergency generator tank systems, does the LLD create an audible and visual <br />alarm when a leak is detected? <br />LD -2000 <br />supreme <br />® <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a <br />release is detected? <br />® <br />D <br />El <br />For electronic LLDs, does the turbine automatically shut off when a release is <br />detected? <br />11 <br />El <br />V <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system is disabled or disconnected? <br />Ll <br />Ii <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />monitoring system malfunctions or fails a tightness test? <br />LJ <br />J <br />V <br />For electronic LLDs, have all accessible wiring connections been visually inspected <br />for kinks and breaks? <br />1j <br />Ii <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />® <br />Ll <br />El <br />Were all LLDs confirmed operational within regulatory requirements? <br />0 <br />L) <br />Ej <br />LLD ID <br />LLD Madel <br />Limes Monitored <br />,Pass <br />Fail <br />87 <br />LD -2000 <br />regular <br />® <br />0 <br />91 <br />LD -2000 <br />supreme <br />® <br />Ij <br />diesel <br />LD -2000 <br />diesel <br />® <br />0 <br />Ll <br />Ii <br />Ll <br />Ii <br />Ii <br />Ii <br />Li <br />Li <br />Lj <br />Li <br />Li <br />Li <br />Lj <br />Li <br />0 <br />Ij <br />Ii <br />Ii <br />Describe all answers marked "No" or "Fail' and proposed remedy it Section 9. <br />List all monitoring equipment either replaced or repaired in Section 9 <br />Page 4 of 6 <br />