My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23665
>
2900 - Site Mitigation Program
>
PR0526080
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:53:58 AM
Creation date
5/18/2020 8:45:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0526080
PE
2965
FACILITY_ID
FA0017647
FACILITY_NAME
RIVERBANK WASTEWATER TREATMENT PLNT
STREET_NUMBER
23865
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
23865 S SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 SUMMARY AND CONCLUSIONS <br /> Task efforts completed by DE as part of the Monitoring Well Installation and previous <br /> study efforts can be summarized as follows: <br /> • Geology beneath the City of Riverbank WWTP is comprised of alluvial material <br /> from the ancestral Stanislaus River. <br /> • Static water levels for MW-10 and MW-11 are 20.36 and 23.15feet bgs,. <br /> respectively. Ground water elevations range from 79.35 to 84.31 feet. Ground <br /> r water mounding has been confirmed by the May round of water levels refer to <br /> Figure 2. First encountered ground water was determined to be perched at <br /> monitoring well MW-10 only. Ground water was first encountered at MW-11 <br /> semiconfined at 26 feet bgs. <br /> • Parameters chloride and TDS are elevated. Both MW-10 and MW-11 exceed the <br /> secondary TDS MCL of 500. MW-10 has an elevated chloride concentration of <br /> 220 mg/L and below the MCL of 250 mg/L. <br /> • Note that these conclusions have been made from one sampling event. In order <br /> to confirm ground water conditions, two additional rounds of water quality <br /> sampling will be completed during the fourth week in May and the second week <br /> in June. <br /> City of Riverbank Wastewater Treatment Plant Monitoring Well Installation <br /> DE Project No 109-06 ME 2006 <br /> 15 Rev.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.