My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23665
>
2900 - Site Mitigation Program
>
PR0526080
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:53:58 AM
Creation date
5/18/2020 8:45:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0526080
PE
2965
FACILITY_ID
FA0017647
FACILITY_NAME
RIVERBANK WASTEWATER TREATMENT PLNT
STREET_NUMBER
23865
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
23865 S SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
vCalifornia Regional Water Quality Control Board <br /> Central Valley Region ; <br /> Winston H. Hickox Steven T.Butler,Chair "'" <br /> Secretaryfor Gray Davis <br /> Sacramento Main Office Governor <br /> Protection Environmental enra! Internet Address: h4://www.swrcb.ca.gov/—rwgcb5 <br /> ian 3443 Routier Road,Suite A,Sacramento,California 95827-3003 O <br /> Phone(916)255-3000•FAX(916)255-3015 �t <br /> 2 October 2000 <br /> w <br /> Mr. Randal Dodd, Public Works Director cn <br /> City of Riverbank <br /> 6707 Third Street <br /> Riverbank, CA 95367 <br /> SCHEDULE EXTENSION REQUEST, QUARTERLY GROUNDWATER MONITORING <br /> REPORT, CITY OF RIVERBANK WASTEWATER TREATMENT PLANT, STANISLAUS <br /> COUNTY <br /> I am in receipt of your letter dated 20 September 2000. I understand that installation of the new <br /> upgradient well was completed on 19 September 2000, and that you propose to submit the next <br /> complete Quarterly Monitoring Report no later than 15 October 2000. <br /> The schedule extension is hereby approved. Please ensure that the report includes the fallowing: <br /> I. A copy of the well installation permit from the San Joaquin County Department of Health <br /> Services; <br /> 2. A complete description of well materials and installation procedures, including a boring log <br /> and well construction diagram; and <br /> 3. Quarterly monitoring data and analysis of gradient and chemical trends for all wells at the <br /> facility. <br /> We look forward to receiving the Quarterly Monitoring Report by 15 October 2000. If you have <br /> any questions, please call me at (916) 255-3140. <br /> ANNE L. OLSON, P.E. <br /> Associate Water Resources Control Engineer <br /> cc: Stanislaus County Environmental Resources Department, Modesto <br /> San Joaquin County Department of Health Services, Stockton <br /> Dave Richard, Nolte Associates, Inc., Sacramento <br /> California Environmental Protection Agency <br /> ea Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.