My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23665
>
2900 - Site Mitigation Program
>
PR0526080
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:53:14 AM
Creation date
5/18/2020 8:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526080
PE
2965
FACILITY_ID
FA0017647
FACILITY_NAME
RIVERBANK WASTEWATER TREATMENT PLNT
STREET_NUMBER
23865
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
23865 S SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 4 <br /> Well Development <br /> Well development will consist of pumping and surging(using a disinfected surge block and rod). All <br /> equipment used for well development shall be cleaned and disinfected prior to introduction to the well. <br /> Pumping will continue until general water quality parameters stabilize including pH,electrical <br /> conductivity,and turbidity. During initial development, pH,electrical conductivity,and turbidity shall <br /> be monitored at least once each casing volume Once initial development is complete,where purged <br /> water is visually clear and pH and electrical conductivity have stabilized,development will continue <br /> until development water is less than 5 NTU measured at 5 to 10 minute intervals. Well development <br /> shall not be performed until a minimum of 72 hours after placement of the well seal. Development <br /> water will be discharged to land or in adjacent disposal ponds on-site. <br /> July 2015 Conformed with 21 October 2015 Conditional Approval 11 MW-5 Replacement <br /> Gty of Riverbank WWTF Monitoring Well Installation Workplan <br />
The URL can be used to link to this page
Your browser does not support the video tag.