My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23665
>
2900 - Site Mitigation Program
>
PR0526080
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 8:53:14 AM
Creation date
5/18/2020 8:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526080
PE
2965
FACILITY_ID
FA0017647
FACILITY_NAME
RIVERBANK WASTEWATER TREATMENT PLNT
STREET_NUMBER
23865
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
23865 S SANTA FE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • CITY OF RIVERBANK WASTEWATER TREATMENT PLANT <br /> • GROUNDWATER MONITORING WELL INSTALLATION WORKPLAN <br /> • MARCH 2005 <br /> • Page <br /> • A. GENERAL INFORMATION..................................................................................... 1 <br /> • 1. Background Information......................................................................................... 1 <br /> • 2. Proposed Monitoring Well Locations..................................................................... 2 <br /> B. DRILLING DETAILS................................................................................................ 2 <br /> • 1. Drilling Equipment................................................................................................. 2 <br /> • 2. Well Installation Activities..................................................................................... 2 <br /> • C. MONITORING WELL DESIGN............................................................................... 3 <br /> • 1. Well Casing and Screen.......................................................................................... 3 <br /> • 2. Filter Pack, Bentonite Seal, and Grout.................................................................... 3 <br /> • 3. Well Protection.......................................................................................................4 <br /> • D. WELL DEVELOPMENT........................................................................................... 5 <br /> • <br /> • E. WELL SURVEY ........................................................................................................6 <br /> • F. SCHEDULE FOR COMPLETION OF WORK.........................................................7 <br /> • <br /> • <br /> • LIST OF FIGURES <br /> • <br /> • 1. Location of Riverbank Wastewater Treatment Plant............................................8 <br /> • 2. Groundwater Contours for March &June 2004...................................................9 <br /> 3. Groundwater Contours for September&December 2004 .................................10 <br /> • 4. Location of Existing and New Monitoring Wells...............................................1 l <br /> • 5. Proposed Monitoring Well Design.....................................................................12 <br /> • <br /> • APPENDIX: GROUNDWATER SAMPLING AND ANALYSIS PLAN <br /> • <br /> LIST OF TABLES <br /> • 1. Proposed Laboratory Analyses for Groundwater Samples.............................. A-6 <br /> • <br /> • <br /> • <br /> • <br /> • <br /> • Riverbank WWTP Workplan Nolte Associates,Inc. <br /> • March 2005 i \\SasO\project\SA1542Mon_well\ncw\gw wiwp\wp.doc <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.