Laserfiche WebLink
' Soil Assessment Work Plan <br /> IDEALEASE - STOCKTON <br /> ' 1137 South Stockton Street, Stockton, California <br /> ' SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> t2.0. SCOPE OF WORK................................................................................................ 1 <br /> 2.1. PERMITTING AND PRE-FIELD WORK PREPARATIONS................................ 2 <br /> 2.2. SOIL PROBE BORING AND SAMPLING .......................................................... 2 <br /> 2.3. LABORATORY ANALYSIS................................................................................ 3 <br /> 3.0. PROCEDURES..................................................................................................... 3 <br /> 3.1. SOIL PROBE BORING ADVANCEMENT.......................................................... 3 <br /> 3.1.1. Soil Sampling............................................................................................... 4 <br /> ' 3.1.2. Boring Abandonment................................................................................... 4 <br /> 3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT..........................4 <br /> ' 3.3. REPORTING...................................................................................................... 4 <br /> tFIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 —Adsorbed TPH-d: Post-Excavation <br /> ' APPENDICES <br /> t Appendix A - Central Valley Regional Water Quality Control Board Directive Letter <br /> Appendix B - Site Background Information <br /> 1 <br /> 1 <br /> 1 <br /> Advanced GeoEnvironmental Inc. <br /> 1 <br />