Laserfiche WebLink
s � <br /> Groundwater Monitoring Report — Second Quarter 2014 <br /> IDEALEASE - STOCKTON <br /> 1137 South Stockton Street, Stockton, California <br /> SECTION PAGE <br /> 1.0. INTRODUCTION................................................................................................... 1 <br /> 2.0. PROCEDURES..................................................................................................... 1 <br /> 3.0. FINDINGS ............................................................................................................. 1 <br /> 4.0. SUMMARY AND CONCLUSIONS........................................................................2 <br /> 5.0. RECOMMENDATIONS.........................................................................................2 <br /> 6.0. LIMITATIONS ....................................................................................................... 3 <br /> FIGURES <br /> Figure 1 - Location Map <br /> Figure 2 - Site Plan <br /> Figure 3 - Groundwater Elevation —April 2014 <br /> Figure 4 - Dissolved TPH-d- April 2014 <br /> TABLES <br /> Table 1 - Well Construction Details <br /> Table 2 - Groundwater Elevation Data <br /> Table 3 - Analytical Results of Groundwater Samples - EPA Methods 8015MI8260B <br /> APPENDICES <br /> Appendix A - Site Background Information <br /> Appendix B - Monitoring and Sampling Procedures <br /> Appendix C - Field Logs <br /> Appendix D - Laboratory Report of Groundwater Samples <br /> Appendix E - Trend Graphs <br /> Advanced GeoEnvironmentnl Inc. <br />