Laserfiche WebLink
� i <br /> i <br /> Bibliography <br /> Phase I Preliminary Hazardous Materials Site Assessment dated July 21, 1993 prepared by Telic <br /> Engineering Corporation <br /> Phase II Site Assessment Report dated January 23, 1995 prepared by Apex <br /> Workplan for Limited Subsurface Investigation and Workplan Addendum for Limited Subsurface <br /> Investigation dated May 2, 1995 and January 24, 1997, respectively,prepared by Apex <br /> Results of Subsurface Investigation dated August 21, 1997, prepared by Apex <br /> Apex submitted Workplan for Pilot Test and Feasibility Analysis and Addendum to Workplan <br /> for Pilot Testing and Feasibility Analysis was resubmitted in January 1999 <br /> Mass Balance for Remaining TPH G , dated April 1999 ,prepared by Apex <br /> Apex submitted a Workplan for Additional Subsurface Investigation and Site Characterization <br /> dated June 9, 1999 <br /> Estimated Mass of Petroleum Hydrocarbon Constituents Remaining in Groundwater, prepared <br /> by Apex dated February 8, 2000 <br /> GHH submitted an Additional Assessment Workplan to the County in April 2001 <br />