Laserfiche WebLink
w CD N G E N G T N E E R S _ T N C _ <br /> 4578 Feather River Drive Suite A <br /> Stockton , California 95207 <br /> ( 209 ) 476-0011 <br /> OCTOBER 3 , 1989 <br /> 01 <br /> DENNIS COTE ' JAMES MILLER <br /> SAN JOAQUIN COUNTY PUBLIC HEALTH SERVICES <br /> DEPT . OF PUBLIC WORKS SAN JOAQUIN COUNTY <br /> P . O. BOX 1810 P . 0. BOX 2009 <br /> STOCKTON , CA 95201 STOCKTON , CA 95201 <br /> RE : PANELLA PROPERTIES UP-89-28 /'- ✓� <br /> GENTLEMEN : <br /> WE SUBMIT THE FOLLOWING FOR CLARIFICATION PURPOSES : <br /> PANELLA IS ONLY ASKING FOR APPROVAL OF ADDITIONAL PARKING <br /> FOR TRUCKS AND TRAILERS . EVERYTHING ELSE WHICH EXISTS WAS <br /> CONSTRUCTED UNDER PERMIT WITH THE REQUIREMENTS AT THAT TIME . <br /> CARDINAL AVENUE IS WITHIN THE DIVERTING CANAL RIGHT OF WAY . <br /> IN 1979 WHEN PANELLA OBTAINED THE USE PERMIT FOR THE OFFICE <br /> AND MAIN SHOP, THE COUNTY REQUIRED THEM TO WIDEN CARDINAL <br /> AVENUE WITH 10 ADDITIONAL FEET OF PAVING FOR THE ENTIRE <br /> LENGTH OF THEIR PROPERTY . THE PAVING ON CARDINAL ON THEIR <br /> SIDE IS MORE THAN 20 FEET WIDE FROM CENTER LINE (THE STANDARD <br /> FOR A 60 FOOT WIDE STREET ) . THERE SHOULD BE NO NEED FOR THE <br /> WIDENING AND IMPROVEMENT CONDITION . k <br /> WE HAVE INITIATED THE ABANDONMENT OF FARM STREET WITH TONY <br /> TSCHIRKY OF THE PUBLIC WORKS DEPARTMENT. SEE ATTACHED LETTER . <br /> CALTRANS HAS RECENTLY WIDENED THE BRIDGE OVER THE DIVERTING <br /> CANAL TO THE NORTH SIDE AND IMPROVED THE APPROACHES . THERE <br /> SHOULD BE NO FURTHER IMPROVEMENT REQUIRED. IF YOU REFER TO <br /> ASSESSORS MAP 143-29 OR BOOK 24 OF SURVEYS , PAGE 42 , YOU WILL <br /> FIND THAT THERE IS A TRIANGULAR PARCEL OF LAND BETWEEN THE <br /> SOUTH SIDE OF FREMONT STREET AND THE PANELLA PROPERTY WHICH <br /> BELONGS TO THE SACRAMENTO AND SAN JOAQUIN DRAINAGE DISTRICT . <br /> THE RADIATOR SHOP IS CONNECTED TO CALIFORNIA WATER SERVICE <br /> COMPANY. THE OFFICE AND SHOP ARE RECEIVE THEIR WATER FROM <br /> THEIR PRIVATE WELL SINCE THEY WERE CONSTRUCTED IN 1979 . <br /> THE WATER DEMAND FOR THE PANELLA OPERATION IS VERY SMALL <br /> AND THE PRESENT PRIVATE WELL SYSTEM IS MORE THAN ADEQUATE . <br />