Laserfiche WebLink
Califia, LLC <br /> River Islands 5044.500.101 <br /> WORK PLAN FOR REMOVAL OF MONITORING WELL MWR-27 September 12, 2023 <br /> THROUGH MWR-30 Page 2 <br /> Once MWR-27 has been adequately removed, the borehole will be grouted with neat cement by the <br /> tremie method to approximately 5 feet bgs. Hydrated bentonite pellets will be placed in the remaining <br /> 5 feet to the ground surface. <br /> SCHEDULE <br /> We plan to complete the removals pending approval of this work plan and subcontractor availability. <br /> Following well demolition, a Well Destruction Report will be submitted to document destruction <br /> methods. <br /> If you have any questions or comments regarding this work plan, please call and we will be glad to <br /> discuss them with you. <br /> Sincerely, <br /> SS\ANAL �EOC ��G\NEERIN� c <br /> ENGEO Incorporated �o�``O�y M•JOy,�s °°� ��� P�� A �Rq0 <br /> o v, <br /> U N No. 2523 0 <br /> Cody Jo son, PG, QS 9TF OF CA\�FG��P c awf rd, C G F of CA�\F���P <br /> cj/zc/rev:sdh/cjn <br /> Attachments: RI Well Map <br /> Well Installation Logs (2005) <br /> River Islands (Owner)Well Demolition Approval <br /> Regional Board Well Demolition Approval <br />