Laserfiche WebLink
.rS <br /> WORK REQUEST FORM <br /> Date of Request 051005 Requested Completion Date 052005 <br /> Proj Name- Greer Construction Proj No 54 25291 0001 <br /> Site Address 15634 Steinegul Rd , Escalon Task 01 <br /> Project Manager _ Jeanne Homsey Field Tech Alex F / Charlie S <br /> Client Contact Brian Greer Phone No 838-3596 <br /> Regulatory Contact Jeff Wong _ _ Phone No 468-0335 <br /> Approval. Completion Date <br /> Notify Client contact and Regulator 48 hrs_prior to field work <br /> On-site contact Albert Veldstra 838-7894 <br /> Monitor DTW/DTB in all nine gw monitoring wells and _on-site drinking water <br /> well if possible <br /> Purse and sample all wells MW-1-9 in order_ <br /> Monitoring order MW8, DW, 3, 4, 9, 5,% 6, 2 & 1 <br /> Monitor for D O with YSI.95 in allygroundwater monitoring wells <br /> Contain well purged water, Take two drums. I <br /> Sample all wells for BTEX/ TPHg by EPA 8021B/ 8015M and fuel oLcygenates by <br /> EPA 8260E <br /> Samples to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br /> ^possible and to submit e-data in Geotracker format Global ID 4• T0607700051 <br /> All wells are two-inch, dtw last (02/05) —73-79', dtb -90-1.00' <br /> Prepare purchase order requisition form <br /> Note MW7 was converted to VE3 screen 40-50', well is dry <br /> e <br /> {=) <br /> AFLORESIGREER doc d <br />