Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 051404 Requested Completion Date 052704 <br /> Prod Name Greer Construction Prot No 54 25291 0001 <br /> Site Address 15634SteineszulRd , Escalon Task 01 <br /> Project Manager Drew Van Allen Field Tech Alex F / John S <br /> Client Contact Brian Greer Phone No 838-3596 <br /> Regulatory Contact Jeff Wong Phone No 468-0335 <br /> Approval w _ Completion Date X28 A-E <br /> Notify Client contact and Regulator 48 hrs prior to field work A F <br /> On-site contact Albert Veldstra 838-7894 <br /> Monitor DTW/DTB in all nine gw monitoring wells and on-site drinking water <br /> well if possible <br /> Purge and sa=le all wells MW-1-10 wells in order <br /> Monitoring order MW-10, 8, DW, 3, 9 4, 1, 5, 6 & 2 <br /> Monitor for D O with YS195 in all groundwater monitoring wells <br /> Contain well purged water Take two drums <br /> Sample all wells„for BTEX/TPHg, TPHd and fuel oxygenates by EPA 8260B <br /> Samples to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br /> possible and to submit e-data in Geotracker format Global ID # T0607700051 <br /> All wells are two-inch dtw last (02/04) -70-74', dtb —90-100' _ <br /> Note MW 10 is damaged <br /> Prepare purchase order requisition form k <br /> Note MW7 was converted to VE3 screen 40-50' well is d <br /> AFLORESIGREER doe <br />