Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 020304 Requested Completion Date 020504 <br /> Proa Name Greer Construction Proj No 54 25291 0001 <br /> Site Address 15634 Steinegul Rd , Escalon Task 01 <br /> Project Manager Drew Van Allen Field Tech San Diego <br /> Client Contact: Brian Greer Phone No 838-3596 <br /> Regulatory Contact Jeff Wong Phone No 468-0335 <br /> Approval. !P`---V`—� Completion Date <br /> Notify Client contact and Regulator 48 hrs prior to field work AJL, <br /> On-site contact Albert Veldstra 838-7894 cAw <br /> _Monitor DTW/DTB in all_ nine gw_ monitoring wells and on-site drinking water <br /> well, if possible Well MW 10 is damaged and will be destroyed soon <br /> Purge and sample all wells MW--1-9 wells 1n order <br /> Monitoring order MW-8 DW 3 9 4 5 1 6 & 2 <br /> Monitor for D O with YSI 95 in all groundwater monitoring <br /> Contain well purged water Take two drums <br /> Sample all wells for BTEX/TPHg, TPHd and fuel oLcygenates by EPA 8260B <br /> Samples to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br /> possible and to submit e-data in _Geotracker format Global ID # T0607700051_ <br /> All wells are two--inch, dtw last (06/01) —69-75', dtb ---90-100' <br /> Rmare purchase order requisition form cI+I, <br /> Note MW7 was converted to VE3 screen 40-50', well is dry <br /> AFLORESIGREER doc <br />