Laserfiche WebLink
rl r <br /> WORK REQUEST FORM <br /> Date of Request 05/16/03 Requested Completion Date a 5/19/03 <br /> Proj Name Greer Construction Proj No 54 25291 0001 <br /> i <br /> Site Address 15634 Steinegul RdiEscalon Task 01 <br /> Project Manager Drew Van Allen <br /> Field Tech Alex F <br /> Client Contact Brian Greer Phone No 838-3596 <br /> Regulatory Contact Jeff Wong, Phone No 468-0335 <br /> Approval Completion Date 0520 A5'_ <br /> Nott Client contact and Regulator 48 hrs prior to field work Af::: E� <Z, - <br /> Monitor DTW/DTB in all ten gw monitoring wells and on-site and off-site <br /> drip :mg water wells if possible <br /> Pure and sample all wells MW-1-10 on-site and off-site drinking water wells in <br /> order <br /> Monitoring order MW-10 8 3 4 9 5 19 6 & 2 <br /> Monitor for DO with YSI 95 in all groundwater monitorin wells <br /> Contain well purged water <br /> Take six drums <br /> Sample all wells for BTEXJTPHg, TPHd Ox enates 1— EPA 8260B <br /> Sam les to Argon Labs Note in C-O-C to re ort MTBE at lowest detection Limit <br /> ossible and to submit e-data in Geotracker format Global ID # <br /> All wells are two-inch dtw last 06/01 –67-69dtb -100' <br /> Pre are urchase order re uisition form <br /> On-site drinking water well owners 838-7894 Albert and Wanda Veldstra left <br /> message The-y know that additional activities are required <br /> Off-site drinking water well owner Al Phillips, 838-7166 they were notified and <br /> they would like vnuto sample their well Monday mornin between 0830 and <br /> 1000 <br /> Note aroundwntpr Monitoring well MW7 was converted to VE3 Screen 30-40 or <br /> 30-50 probablv <br /> AF ORESTACCOAST doc <br />