Laserfiche WebLink
WORK REQUEST FORM <br /> Date of Request 052203 Requested Completion Date 052303 <br /> Proj Name Greer Construction Prod No 54 25291 0001 <br /> Site Address 15634 Steine ul Rd Escalon Task 01 <br /> Project Manager Drew Van Allen Field Tech Case K/ Mike L <br /> Client Contact Brian Greer Phone No 838-3596 <br /> Regulatory Contact Jeff Wong Phone No 468-0335 <br /> Approval D:�, V,--,AACompletion Date 052-30 3 <br /> Notify Client contact and Regulator 48 hrs pnor to field work#,(�' ,DtA& <br /> On-site contact Albert Veldstra 838-78.94 A-F LAI . ,n�SSA P ,, <br /> Off-site drinking water well owner Al Phillips 838-7166 o� a�- �n ln,AIX <br /> Monitor DTW/DTB 1n all ten g_w monitoring wells and on-site —e <br /> drmking_water wells, if possible <br /> Purge and sample all wells„MW-i-10 wells in order _ <br /> Monitorxn order MW-10, 8, 3, 4, 9, 5, 1, 6 & 2 _ <br /> Monitor for DO with YSI 95 in all groundwater monitoring wells <br /> Contain well purged water <br /> Take two drums <br /> Sample all wells for BTEX/TPHg,_TPHd and fuel oxygenates by EPA 8260B_ <br /> Sam les to Argon Labs Note in C-O-C to report MTBE at lowest detection Limit <br /> possible and to submit e-data in Geotracker format Global ID # <br /> All wells are two-inch dtw last 06/01 —67-69 dtb —90-100' <br /> Note MW 10 well monument is damaged, take hand tools 2" vc mpe and <br /> coupling, reads-mix concrete to re air well monument <br /> Pre are nurchase order requisition form <br /> Note MW7 was converted to VE3 screen 40-50' well is dry <br /> i <br /> AFLORESIGREER doe <br />