Laserfiche WebLink
SVE/OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> � <br /> Date / 7- 0Time of Anwal - <br /> Technician Time of Departure <br /> Site Engineer Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location Ranch Market 23569 South Santa Fe Road, Riverbank,CA Project No S8643-_06-01 <br /> KVA C-Sparger Panel 120V/16 A 120 s are oint stem Senal No L41100 <br /> Abatement Equip_Solieco o& 0 1-71-1-10CDtaivt+c Oxidizer <br /> SVE Blower Elect Meter Reading <br /> Telemetry <br /> Electrical Power 230 V 3 phase-200 am , <br /> Supplemental Fuel 45Zf 4_11{ <br /> No of IVO barrels at site Full Empty <br /> PART B Ozone Sparge System ' <br /> System up or down upon amnia! �✓� f Odors detected inside shed? <br /> Hour Meter Reading Temp reading inside shed , <br /> Cycle Timer(min) _ _ S-1 S-2 8.33 S-4 S-5 <br /> S-6 S-7 $/ <br /> 5-9 S-30 <br /> S-11 5-12 S-1J3T S-15 <br /> ---F S-16 S-17— _ S-� �S-19 _ _ S-20 <br /> PART B SVE SYSTEM DATA <br /> e r��System up or down upon arrival (If down please complete PART E) <br /> Hourmeter Reading _ _ At time 7.' <br /> i) <br /> Flow Data Before Adjustment After Ad ustment Final <br /> %Dilution air valve open <br /> Recirculation %o en <br /> IVO Content al <br /> Vacuum 0 blower(in H2O) <br /> Gauge Range 0-100 <br /> Tota!System Flow(,&P,in H2O) <br /> Pipe Size Well Field Air Flow(A P,in H2O) }( l <br /> Pipe Size 4" j <br /> Dilution Air Flow(A P,"H2O) <br /> Pipe Size 1 <br />