My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008340
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:48:22 AM
Creation date
5/18/2020 11:14:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008340
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME Ranch Market JOB NUMBER 770T 43622 01 0010 <br /> Work Conducted Byf <br /> DATE ` <br /> � <br /> ) NIMBI m1i <br /> 1 After arriving on-site, review work order, HASP, and JSA within HASP on Ozone Gas Hazards <br /> __.. _ <br /> Note_Specific Hazards for conducting working around the offsite wells on second page of work order <br /> 2) Prior to_conducting-field work, insert ozone sensitive paper into badge and attach to shirt or coat <br /> _ Make sure ozone meter has been warmed up Warm up times can be greater than.1 hour _ <br /> Refer to second page of work order and fill out requested information <br /> 3) Monitor and document ozone readings outside of ozone compound and ozone panel <br /> Since ozone is heavier than air, be sure to monitor for ozone at low points in compound and panel <br /> If positive ozone readings are encountered, call project manager to discuss possible solutions <br /> 4) If no positive ozone readings are found, inspect fittings and tubing connection for signs of wear or damage <br /> 5) Using meter, Monitor for Ozone 03 along the piping runs, at top of each injection well lid, and within each well box <br /> If positive ozone readings are encountered, call project manager to discuss possible solutions _ <br /> 6 Before leaving the site check your Ozone badge and note badge color on second page of work order <br /> 1 ' <br /> 7 Call into the Sacramento office before you leave the site <br /> S Forward field notes and equipment rental forms to Jaff Auchterlonle in Sacramento <br /> 3 <br /> Site Safety Plan-- <br /> 03 <br /> lan_03 Meter and Ozone Badge <br /> -112",-9116'-and 15118"sockets-pliers-and other mise tools-- <br /> Traffic <br /> ools Traffic Delineators Nitrile gloves, COC's, drum labels etc <br />
The URL can be used to link to this page
Your browser does not support the video tag.