My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008341
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:52:39 AM
Creation date
5/18/2020 11:16:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008341
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME Ranch Market-System Installation JOB NUMBER 770T.4W22 010008 <br /> CONTACT _Mr Ken Randhawa(209)545-0397 DATE PREPARED 07P11/,02 Jeff Auchterlonle <br /> *DRESS 23569 Santa Fe Road OVER SITE BY <br /> Riverbank CA 95367 DATE <br /> "After arnvin on-site review work order and SSP then call Jaff Auchtedome in Sacrame to" <br /> 1) Check in with Store manager, Mr Ken Randhawa (209)545-0397 <br /> ---- 2) Review Site Safety Plan with Subcontractor El Dorado Remediation Orbup <br /> Jeff Brown .... (530)677-7581 <br /> Conduct Daily Tali Gate-Safetr Me_ebng Review scope of work that will be performed that day and <br /> identify specific hazardous related to the wotk <br /> Have subcontractors working for SECOR sign the site safety plan and the Daily Safety Meeting sheet. <br /> 3) Review scope of work and ensure the scheduled work follows the design specifications <br /> Confirm with Jaff Auchterlome any changes in the design plans <br /> _-_ 4) Document the work performed and maintain As-Built Sketch of actual piping/trench layouts <br /> Take photos of trench layout, piping,junctions within piping trenches,and compound <br /> 5) Stockpile samples will be collected from the trenching stockpile after construction work is completed <br /> Collect two(4-point)Composite soil samples in 2-inch diameter by 3-inch long brass sleeves <br /> Lab 0 Samples # Container _TAT _Analyses___ <br /> Kiff 2 4 Brass Sleeve 1 Wk (BTEX, TPHg,MTBE EPA 8260) <br /> Kiff 2 4 Brass Sleeve 1 Wk (Total Lead,EPA 6010) <br /> Lab Contact Kiff Analytical Mr Joel Kiff Phone 530-297-4800 <br /> 720 Olive Drive, Suite D FAX 530-297-4803 <br /> Davis CA 95616 — <br /> 6) "Call Jim or Jaff In Sacramento before you leave the site" <br /> 7) Leave originals of all notes and COC's with Jaff Auchterlonle In Sacramento _ <br /> Health&Safety Site Plan — <br /> (8)Brass Sleeves and Caps One Cooler with ice Camera ` <br /> FID or PID to monitor breathing zone during trenching <br /> 112" 9116',and 15116"sockets,and other mise tools+— �- <br /> Direct all questions to Jf o Jaff 916 861-0400 ext 223-office <br /> j - <br /> VECVi6T MANAGER, JAFF AUCHTERLONIE AUTHORIZATION <br /> �611t (HI /C4 -rfjCK <br />
The URL can be used to link to this page
Your browser does not support the video tag.