My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008341
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:52:39 AM
Creation date
5/18/2020 11:16:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008341
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOB NAME Ranch Market-System Installation JOB NUMBER 770T 43622 010008 <br /> CONTACT Mr Ken Randhawa(209) 545-0397 DATE PREPARED 07/11/02 Jeff Auchterlonie <br /> ADDRESS 23569 Santa Fe Road OVER SITE BY <br /> Riverbank CA 95367 DATE <br /> "After arriving on-site, review work order and SSP, then call Jaff Auchterlonie in Sacramento" <br /> _ -1)- Check in with Store manager, Mr Ken Randhawa (209)„845-0397 <br /> 2) Review Site Safety Plan with Subcontractor EI Dorado Remediation Group <br /> „Jeff Brown (530)677.7561 _ <br /> _ Conduct Daily Tail Gate Safety Meeting Review scope„of work that will be performed that day and <br /> identify specific hazardous related to the work <br /> - Have subcontractors working,for SECOR sign the site safety plan and the Daily Safety Meeting sheet <br /> __ 3) Review scope of work and ensure the scheduled work.follows the design specifications <br /> Confirm with Jaff Auchterionle any changes in the design plans <br /> 4) Document the work performed and maintain As-Built Sketch of actual piping/trench layouts, <br /> _ . Take photos of trench,layout, piping,Junctions within piping trenches,and compound <br /> 5) Stockpile samples will be collected from the trenching stockpile after construction work is completed <br /> Collect two(4-polnt)Composite soil samples in 2-inch diameter by 3-inch long brass sleeves <br /> ab #Samples _g_ Container SAT_ Analvses <br /> Kfff 2 4 Brass Sleeve_ 1 Wk (BTEKG TPHg,MtBE EPA 8280} <br /> Kff 2 4 Brass Sleeve—l_Wk(Total Lead,EPA 6010)__— --- - - <br /> Lab Contact Klff Analytical — Mr.Joel Kiff- Phone.530-297-4800 - <br /> _720 Olive Drive, Suite D_ FAX 530-2974803 <br /> Davis CA 95616 <br /> --_- "Call Jim or Jaff In Sacramento before you leave the site” <br /> 7) Leave originals of all notes and COC's with Jaff Auchterlonie In Sacramento <br /> Health&Safety Site Plan _ <br /> (8)Brass Sleeves and Caps One Cooler with Ice Camera _ <br /> FID or PID to monitor breathing zone during trenching - .,....._ <br /> 112” 9116' and 15116"sockets and other misc tools �_.,.. <br /> Direct all uestions to Jim or Jaff 916 861-0400 ext 223-office <br /> PROJECT MANAGER, JAPFAUCHTERLONIE AUTHORIZATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.