Laserfiche WebLink
Table 2 <br /> Soil Boring and Well Construction Details <br /> • Ranch Market <br /> 23569 South Santa Fe Road <br /> Riverbank,Califomia <br /> well Screen Screen <br /> Well Drill Depth Diameter Top Bottom Length Comments <br /> I.D. Date (feet bgs) (inches) (feet bgs) (feet bgs) (feet) <br /> B-1 01/23/98 30 -- -- -- -- Tank Pit Boring <br /> MW-1 11/24/98 40 2 25 40 15 Tank Pit Monitoring Well <br /> MW-2 11/24/98 40 2 25 40 15 Monitoring Well <br /> MW-3 11/25/98 40 2 25 40 15 Monitoring Well <br /> MW-4 11/24/98 40 2 25 40 15 Monitoring Well <br /> GP-1 07/18/00 35 -- -- -- -- Geo-probe Soil Boring <br /> GP-2 07/17/00 45 -- -- -- -- Geo-probe Soil Boring <br /> GP-3 07/17/00 30 -- -- -- Geo-probe Soil Boring <br /> GP-4 07/18/00 35 -- -- -- -- Geo-probe Soil Boring <br /> SB-1 07/24/00 70 -- -- -- -- Continous Core Soil Boring <br /> SB-2 07/24/00 70 -- -- -- Continous Core Soil Boring <br /> SB-3 08/10/00 35 -- -- -- -- Soil Boring for Discrete Water Sam 1 <br /> MW-5D 08/09/00 70 2 65 70 5 Deep Monitoring Well <br /> MW-5 08/09/00 40 2 30 40 10 Monitoring Well <br /> • MW-6 08/09/00 40 2 30 40 10 Monitoring Well <br /> MW-7 08/09/00 40 2 30 40 10 Monitoring Well <br /> MW-8 08/10/00 40 2 30 40 10 Monitoring Well <br /> MW-9 08/08/00 40 2 30 40 10 Monitoring Well <br /> DW-1 --- 70 5 75 Steel 60 70 10 Onsite Domestic Well <br /> DW-2 --- 59 ? 6 25 Steel 57 open botto 9 Destroyed 1/11/01 <br /> DW-3 --- 140 ? 6 Steel --- --- --- Offsite Domestic Well <br /> DW-4 --- 140 6 Steel --- --- --- Offsite Domestic Well <br /> DW-2R 12/22/00 274 6"Steel 208 248 40 Offsite Domestic Well <br /> AS-1 09/21/00 51 2 40 45 5 Air S arge Well <br /> V-1 09/21/00 31 2 13 30 17 Soil Vapor Extraction Well <br /> V-2 09/21/00 31 2 13 30 17 Soil Vapor Extraction Well <br /> V-3 09/21/00 31 2 13 30 17 Soil Vapor Extraction Well <br /> V-4 09/21/00 30 2 13 30 17 Soil Va or Extraction Well <br /> V-5 09/22/00 30 2 13 30 17 Soil Vapor Extraction Well <br /> V-6 09/22/00 30 2 13 30 17 Soil Vapor Extraction Well <br /> CPT-1 10/12/01 43 -- -- -- -- I Cone Penetrometer Test Boring <br /> CPT-2 10/12/01 40 -- -- -- -- Cone Penetrometer Test Bormg <br /> CPT-2A 10/12/01 76 -- -- -- Cone Penetrometer Test Boring <br /> CPT-3 10/12/01 65 -- -- -- Cone Penetrometer Test Boring <br /> V-7 07/08/02 30 2 13 30 17 Soil Vapor Extraction Well <br /> V-8 07/08/02 30 2 13 30 17 Soil Vapor Extraction Well <br /> V-9 07/08/02 30 2 13 30 17 Soil Vapor Extraction Well <br /> V-10 i 07/08/02 30 2 13 30 17 Soil Vapor Extraction Well <br /> Ranch Market-Rnrerbankrrables/ft-WELL BORING SUM Page 1 of 2 <br />