Laserfiche WebLink
i <br /> Ranch Market <br /> 23569 South Santa Fe Road - 2 - 13 May 2002 <br /> I <br /> systems are implemented, the responsible parties will be required to optimize system performance by <br /> shutting off or adjusting flow rates from certain SVE wells based on the measured contaminant <br /> concentrations in both the contaminant concentrations at the individual extraction wells and the <br /> influent to the treatment system Modifications may include the expansion of the remedial system <br /> such as installing additional vapor extraction wells and monitoring points <br /> After the SVE and ozone sparging systems have been operated for a suitable time and mass removal <br /> rates are declining, a preliminary evaluation of system shut off will need to be performed If <br /> contaminant concentrations for all extraction wells and the combined vapor influent have reached <br /> asymptotes, the system should be shut off to determine if contaminant rebound will occur <br /> If after these actions, the cleanup goals have not been met, an evaluation of whether or not it is <br /> economically and technically feasible to continue remediation using the existing SVE and ozone <br /> sparging systems, or to evaluate an alternative remedy will need to be conducted <br /> 4 Secor recommends monitoring and sampling air sparge pilot test well AS-1 on a quarterly basis <br /> AS-1 is screened from 40 to 45 feet, and water samples from this depth would be helpful to monitor <br /> the dynamics of the plume during remediation Thus recommendation is approved <br /> I <br /> 5 Board staff accepts the Project Schedule included in the Workplan with a system startup planned for <br /> late July 2002 Please notify this office and the County in writing if there are substantial set backs in <br /> this schedule, and update the schedule in future quarterly monitoring events until the remedial <br /> systems are installed and operational <br /> 6 UST regulations require public notice prior to implementing a corrective action plan Therefore, <br /> please send a one-page summary of the proposed activities contained in the FRP and the approved <br /> Workplan to the four residences near the Ranch Market site, and to Mr Mike Infurna at the San <br /> Joaquin County Environmental Health Department(County) for posting at the County office <br /> All reports and correspondence are to be submitted to this office and to Mr Infurna with the County <br /> Please call Mr Infurna at (209) 468-3454 and me at least five business days prior to any site work or <br /> sampling to schedule a field inspection appointment If you have any questions or comments, please call <br /> me at(916) 255-3115 <br /> 'C�- ? va^-- <br /> Marty Hartzell, R G <br /> Associate Engineering Geologist <br /> cc Mr. Mark Owens, UST Cleanup Fund, SWRCB, Sacramento <br /> Mr Mike Infurna, San Joaquin County Environmental Health Division, Stockton <br /> Mr Jaff Auchterlome, Secor International Incorporated, Sacramento <br /> • <br />