My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008376
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
23569
>
2900 - Site Mitigation Program
>
PR0541936
>
ARCHIVED REPORTS_XR0008376
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2020 11:45:25 AM
Creation date
5/18/2020 11:27:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008376
RECORD_ID
PR0541936
PE
2957
FACILITY_ID
FA0006149
FACILITY_NAME
RANCH MARKET
STREET_NUMBER
23569
Direction
S
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95376
CURRENT_STATUS
02
SITE_LOCATION
23569 S SANTA FE RD
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IJOB NAME Ranch Market JOB NUMBER 077 42098 002 SVEIAS Well Install <br /> CONTACT Mr Na i Saleh Ali 209-545-397 DATE PREPARED 07/26/00 Jaff Auchterlonie <br /> ADDRESS 23569 South Santa Fe Road SAMPLED BY �lw so <br /> • Riverbank, CA 95367 SAMPLE DATE 10/7 1 m -3 v <br /> file WorkRequestlRB-SVE-Test As <br /> y <br /> Sacramecto WORK REQUEST <br /> Conduct SVEIAS Feasibili Test 12-hour SVE Test and 8-hour SVEIAS Test <br /> Equipment will be delivered Tuesday by EnviroSupply Services, Inc -Jeff 510 385-7530 <br /> 1 After arriving on-site, review work order and SSP,then Check in with Store manager Mr Abdul Lsumain <br /> Set-up Traffic Control to define work area in front of store entrance <br /> 2 Oen all wells to be monitored and let groundwater levels equilibrate DTW should range from 25 to 30 feet b s <br /> Monitor DTW, DTB, D O in The six SVE wells, one Air Sparge Well, and MW-1 through MW-4 <br />' 3 Conduct feasibility test as written in the attached work plan <br /> SVE Test#1 3 hour Test Extract From V-2 <br />' Monitor From V-1, V-3, V-4,V-5, V-5,and V-6 <br /> Monitor flow rate,applied vacum, influent FID concentration,and applied vacuum every 15 minutes <br />' Collect one Vapor Sample-VE-V-2 15 minutes before terminated test, or 2 hours and 45 minutes into test <br /> Monitor D O and DTW in AS-1, MW-1 through MW-4 and adjacent Vapor Wells after collecting vapor sample <br />' SVE Test#2 3 hour Test Extract From V-1 <br /> Monitor From V-2,V-3, V-4, V-5,V-5, and V-6 <br />' Monitor flow rate,applied vacum, influent FID concentration, and applied vacuum eveEx 15 minutes <br /> Collect one Vapor Sample VE-V-1 5 minutes before terminated test, or 2 hours and 55 minutes into test <br /> Monitor D O and DTW in AS-1, MW-1 through MW-4 and adjacent Vapor Wells after collecting vapor sample <br />' SVE Test#3 3 hour Test Extract From• V-5 <br /> Monitor From V-1 V-2,V-3,V-4,and V-6 <br /> Monitor flow rate,applied vacum,influent FID concentration and applied vacuum every 15 minutes <br /> Collect one Vapor Sample VE-V-5 5 minutes before terminated test, or 2 hours and 55 minutes into test <br />' Monitor D O and DTW in AS-1,MW-1 through MW-4 and adjacent Vapor Welts after collecting vapor sample_ <br /> FC� ✓9e <br /> �yrTzL��',a <br /> SVE Test#4 3 hour Test Extract From V-1 V-2,V-3,V-4,V-5, and V-6 <br />' Monitor From <br /> Monitor flow rate,applied vacum, influent FID concentration,and applied vacuum every 30 minutes <br />' Collect one Vapor Sample Inf-SVE 5 minutes before terminated test, or 2 hours and 55 minutes into test <br />' Monitor D O and DTW in AS-1, MW-1 through MW-4 and adjacent Vapor Wells after collecting vapor sample <br /> 4 Shut downs stem and secure site for the ni ht <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.